Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task#: 015 <br />Date : 0927/2006 <br />User : TAK <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal RN-05 <br />Task description :Rip access road from Hwy 133 fo Sylvester Gulch Road <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Selected estimating method <br />Alternate methods - <br />Seismic <br />Area: <br />PermiUjob # : C-80-007 <br />Abbreviation :none <br />Filename :0007-015 <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br />Dozer operating cosUhour : $98.84 100 <br />Ripper operating cosUhour : $7.51 100 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $212.05 Total Fleet cost hour <br />NA NA <br />0.60 acres <br />Load factor : NA Bank volume <br />Rip depth (ft) : 2.00 Volume <br />Source of estimated quantity :Map 53; MR-75 <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feeUsecond <br />Unadjusted production : NA cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.00 feeUpass <br />Average ripping width : 7.67 feeUpass <br />Average ripping length : 200.00 feeUpass <br />Average dozer speed : 88.00 feet/minute <br />Average maneuver time: 0.25 minutes/pass <br />Production per unit area : 0.838 acres/hour <br />Unadjusted production : 2,702.54 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 4 dozers) <br />Unit cost : $0.095 per cu. yd. <br />State :Colorado <br />County :Gunnison <br />Site :West Elk Mine <br />Horsepower: 405 <br />Area <br />NA <br />1,936 <br />$848.19 <br />........................... <br />.......................... <br />........................... <br />.......................... <br />........................... <br />........................... <br />.......................... <br />BCY <br />BCY or CCY <br />Unadjusted production <br />per selected method : 2, 702.54 cu. yds./hour <br />Site altitude : 6,300 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shifUday) <br />Net job correction : 0.83 multiplier <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />2,243.11 cu. yds./hour <br />8,972.44 cu. yds./hour <br />0.22 hours <br />$183 <br />Shift basis : 1 perday <br />Data source : (CRG) <br />