Laserfiche WebLink
CIRCES Cost Estimating Software <br />Agency or organization name <br />Permit or otherjob action <br />Task description <br />Colorado Division Mining, Reclamation And Safety <br />Permit Renewal RN-OS <br />lot <br />HOURLY EQUIPMENT COST <br />Basic machine <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />Cat D9R - 9SU (2005) <br />Semi-Universal <br />ROPS Cab <br />3-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 perday <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br />Operating cosVhour : $98.84 T _ 100 <br />Ripper op. cosf/hour : $0.00 0 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $204.53 Total fleet cosUhour : $818.13 <br />r- <br />--- <br />- <br />~- - <br />- <br />_ <br />L ~ <br />~ <br />MATERIAL OUAMTITIES <br />Initial Swell Loose <br />volume: 13,740 CCY factor: 1.165 volume: 16,007 LCY <br />Source of estimated volume :Permit Volume 7, Exhibit 43 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 115 feet <br />Unadjusted hourly production : 1,130.6 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 18.00 % (pos) <br />Average site altitude : 6,300 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AP1D COST <br />Fleet size : 4 Dozers) <br />Unit cost : $0.858 /LCY <br />Job Condition Correction Factors Source) <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00__ (avg.) <br />Job efficiency : 0.83 (lshift/day) <br />Spoil pile : _ 0.80 (fnd-rfJ <br />Pushgradient: 0.59 (CatHB) <br />Altitude : 1.00_ _ (Cat HB) <br /> <br />Material weight : <br />0.79 _ <br />(Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.21 <br /> <br />Adjusted unit production : 238.51 LCY/hr <br />Adjusted fleet production : 954.08 LCY/hr <br /> <br />Total job time : 16.78 Hours <br />Total job cost : $13,727 <br />Task #: 008 State: Colorado PermiUjob#: C-80-007 <br />Date : 08/312006 County :Gunnison Abbreviation :none <br />User : TAK Site :West Elk Mine Filename :0007-008 <br />