Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # <br />Date <br />User <br />sheet t of 2 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />004 State :Colorado Permifljob # : C-80-007 <br />08/09/2006 County :Gunnison Abbreviation :none <br />TAK Site :West Elk Mine Filename :0007-004 <br />Permit or otherjob action :Permit Renewal RN-05 <br />Task description :Haul coal from stack tubes to waste <br />HOURLY EQUIPMENT COST <br />Truck loader team -Truck :Generic 10-12 <br />-Loader :CAT 966G (20 <br />Support equipment -Load area :Cat D9R - 9SL <br />-Dump area :Cat D9R - 9SL <br />Road maintenance -Motor grader:NA <br />-Water track :NA <br />Shift basis : 1 per day <br />Cost Breakdown : ruck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data flename: truck2 loader dozer dozer NA NA <br />%Utilization-machine: 97 100 100 100 NA NA <br />-Ripper attachment : NA NA 0 0 NA NA <br />Ownership cest/hour: $11.86 $29.75 $64.72 $64.72 NA NA <br />Operating cesUhour : $39.90 $38.33 $98.84 $98.84 NA NA <br />Ripper op. cosUhour : NA NA $0.00 $0.00 NA NA <br />Operator cosUhour : $21.75 $32.78 $32.78 $32.78 NA NA <br />Unit subtotals : $73.50 $100.85 $196.34 $196.34 NA NA <br />Number of units : 5 1 1 1 0 0 <br />Group subtotals : Work : $468.38 Support : $392.68 Maintenance : $0.00 <br />Total work team cosUhour : $861.05 <br />;, <br />,: ;:.:.: <br />,:.: ; <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 25,700 LCY factor : NA volume : 25,700 LCY <br />Rated payload : 35,400 pounds Average volume : 11.00 LCY <br />Payload capacity : 22.12 LCY Adjusted volume': 12.00 LCY <br />Final truck volume based on number of loader passes : 8.55 LCY <br />-truck volume etlrystetl to not exceetl rated payload or heaped volume <br />Loading Tool Caoacily <br />Rated capacity (nom. heaped) : 4.750 LCY <br />Descr.: Other- soil, boulders, roots (80 -100%) <br />Bucket fill factor : 0.900 <br />Adjusted bucket capacity : 4.275 LCY <br />Job Condition Corrections : Site altitude (ft.) : 6,300 <br /> Truck ~ Loader Source <br />Altitude adj.: 1.000 0.920 (Cat HB, <br />Job efficiency : 0.830 0.830 (1 shifr/dal <br />Net correction : 0.830 0.764 <br />