Laserfiche WebLink
thence north 89° 22' S1" west 100 feet; thence north 00° 37' 09" <br />east, 413 feet; thence south 89° 22' S1" east 100 feet to the <br />• point of beginning containing 0.948 acres-. <br />-. Section 36 T3N R64W <br />Baseline Vegetation Plot, labeled on drawing as Small Area <br />Exemption (SAE> #2. (SEE DRAWING, Appendix A, 60' ACCESS ROAD <br />EASEMENT, SHEET 5 of 5) <br />From the SE corner of Section 36; thence N 58° 05' S4" W, 2434.10 <br />feet to the POINT OF BEGINNING, being a point on the Southerly <br />line of a 60-foot roadway easement, thence N 77° 44' 39" E, along <br />said line, 512.03 feet; thence S 00° 10' S7" E, 338.86 feet; <br />thence S 89° 94' S6" W, 500.28 feet, t},once N 00° 17' 12" W, <br />232.36 feet to the POINT OF BEGINNING containing 3. 282 acres, <br />more or less. <br />Topsand Pile #1, labeled on drawing as Small-Area Exemption (SAE) <br />#1. (SEE DRAWING, Appendix A, 60' ACCESS ROAD EASEMENT, SHEET 5 <br />of 5) <br />Frorn the SE CUrnel of Sectior, 36, thence N 13° 18' S9" W, 1822.48 <br />feet to the POINT OF BEGINNING, being a point or, the northwesterly <br />line of a sixty-foot roadway easement; thence N 35° 14' 39" W, <br />• 95.11 feet; t},er,ce N 28° 57' 12" E, 601.45 feet; t},ence S 87° <br />~'2' 14" E, 57.6`_. feet to a point westerly line of said roadwa <br />easement; t},ence southwesterly along said line the following <br />courses and distances: 1) S 07° 09' 05" W, 113.06 feet, 2) S <br />39' 16" W, 137.`0 feet, 3) S 26° 39' S`_." W, 148.59 feet, 4) S <br />16' 46" W, 140.50 feet; 5) S 49° 41' 34" W, 171.40 feet to th <br />POINT OF BEGIN?ZING cor,tair,ing 2.115 acres, more or less. <br />Total acreage included in t},e mine permit boundary er,d for <br />reclamation purposes are 8.73 more or less. <br />Y <br />five <br />16° <br />370 <br />e <br /> <br />2/94 <br />