Laserfiche WebLink
<br />PERMIT ACTIVITY SCHEDULE <br />Startup Termin. Dist. Undg <br />Phase Description Date Date Acres Acres <br />1 <br />omoonent Facilttie <br /> <br /> <br />2 <br />Mine Startup 8/87 9/87 34.9 59.0 <br />Raton Creek No.l Mine 28.3 46.7 <br />Raton Creek No.2 Mine 12.3 <br />Mobile Home Site 0.3 <br />Burlington-North A 1 Loadout 3.0 <br />Santa Fe Al Loadout 1.3 <br />Santa Fe A2 Loadout 2.0 <br />Mine from 9/87 9/92 43.0 462.2 <br />Raton Creek Mine <br />Portals <br />omoonent Facilities <br />Raton Creek No.l Mine 36.4 412.3 <br />Raton Creek No.2 Mine 49.9 <br />Mobile Home Site 0.3 <br />Burlington-North A 1 Loadout 3.0 <br />Santa Fe Al Loadout 1.3 <br />Santa Fe A2 Loadout 2.0 <br />Horiz <br />Affected Extent <br />Acres Workings <br />93.9 3,320' <br />2,700' <br />620' <br />505.2 11,720' <br />10,000' <br />1,720' <br />Notes: Phase 1 activities coincide with the Actual Oisturbed and Actual <br />Affected acreage; whereas, Phase 2 activities will coincide with <br />the Permitted Disturbed and Permitted Affected acreages. The <br />Disturbed acreages for the I Ro~a~ cruk Nu.? area are i ncl uded i n the <br />Ruton Creek No.l lvlinc portal acreages. The horizontal extent of workings were <br />measured from the respective -RatnncreckMine Portals. <br />The production schedule for the operation is given in 2.05.3 (1) <br />Production Methods and Equipment. <br />18 <br />Revised 5/93 <br />