Laserfiche WebLink
EFCI -Newlin Creek Mine (Permit No. C-81-045 <br />• NOV C-95-02 <br />Issued By: Division of Minerals & Geology on <br />Date: Feb. 21, 1995. <br />Description: Failure to properly implement drainage and sediment control; failure <br />to properly control erosion; and failure to protect topsoil resources <br />from erosion. <br />Abatement: The areas were seeded on Feb. 18, 1995, and before, and the road <br />construction was completed. <br />Resolution: Terminated April 27, 1995 by David Berry. A civil penalty of $250 <br />was paid on May 19, 1995. <br />NOV C-95-019 <br />Issued by: Division of Minerals and Geology on <br />Date: July 5, 1995 <br />Description: Failure to minimize road and road ditch erosion; failure to minimize <br />drainage structure outlet area erosion; failure to minimize refuse <br />erosion; failure to maintain diversion ditches; failure to minimize <br />• erosion on reclaimed ground; and failure to m;nir~;~e sediment yield <br />to undisturbed or offsite areas. <br />Abatement: EFCI submitted additional permit materials for TR-08; the revision <br />was subsequently approved. Field implementation was completed, <br />including removal and reclamation of the E/W portion of the <br />Shamrock diversion ditch. <br />Resolution: NOV C-95-019 was terminated. A civil penalty of $1,550 was <br />assessed, including a good faith reduction of $250, and paid. <br /> <br />7f Revised: 2/27/98 <br />dvGmorRevffilae-/!t3 <br />RN- 03 9-g= 98 <br />