Laserfiche WebLink
<br />' Section 2.03.8 Permit Term Information <br />'• (1) The anticipated or actual starting and termination <br />date of each phase of the surface mining activities and <br />' the anticipated number of acres of land to be affected <br />for each phase of mining and over the total life of the permit. <br />Not Applicable. <br /> (2) The anticipated or actual starting date and termination <br /> f <br />d <br />t <br />h <br />h f th <br />d <br />d <br />i <br />i a <br />ti <br />iti <br /> a <br />e o <br />eac <br />ase o <br />p e un <br />ergroun <br />m <br />n <br />ng c <br />v <br />es <br /> and the anticipated number of acres of surface lands to <br />' be affected, and the horizontal and vertical extent of <br /> proposed underground mine workings, for each phase of <br />' mining and over the total life of the permit. <br />' The anticipated number of acres of surface lands to he <br />disturbed by the Bear Mine, is 19.3 acres. Refer to <br />the Existing Land Use Map, 2.04.3(2)(a). Bear Coal <br />Company, Inc. does not anticipate any future disturbances <br />of the surface lands. <br />The Operation Plan Map, 2.05.2(1)-1, illustrates the mining <br />' projected for the Bear Mine within the permit term. <br />As fully described in the Operation Plan - Permit Area, <br />' Section 2.05.3, the Eear Mine is planning to mine <br />200,000 to 250,000 tons on N.ap 2.05.2(1)-1. The vertical exT.ent <br />' of mining is the C-Seam. <br />' (3) Surface or underground mining activities in excess <br />of 5 years. <br />Plans are not complete, The Division will be contacted <br />as soon as plans are completed; and an application for mining <br />' will be submitted. <br />1• <br />' REVISED May 15; 1981 20 <br />