FILTER FRABRIC MATERIAL 60" WIDE ROLLS
<br />USE STAPLES OR WIRE RINGS TO ATTACH
<br />FABRIC TO WIRE
<br />2" BY 2" BY 14 GA. WIRE
<br />FABRIC OR EQUIV.
<br />MATERIAL IN B" BY 12"
<br />TRENCH
<br />6' MAX
<br />FRONT VIEW
<br />2" BY 4" WOOD POSTS, STANDARD NTS
<br />OR BETTER OR EQUAL ALTERNATE:
<br />STEEL FENCE POSTS
<br />FILTER FABRIC MATERIAL
<br />2" BY 2" BY 14 GA..
<br />WIRE FABRIC OR EQUIV. ,
<br />6" 6 in
<br />N
<br />WASHED ROCK ,
<br />8" MIN,
<br />PROVIDE 3/4" - 1 -1/2"
<br />WASHED GRAVEL FILL
<br />ON BOTH SIDES OF FILTER
<br />FENCE FABRIC ON
<br />THE SURFACE
<br />SIDE VIEW
<br />NTS
<br />CONSTRUCTION SPECIFICATIONS:
<br />SILT FENCE: THIS SEDIMENT BARRIER UTILIZES STANDARD STRENGTH OR EXTRA
<br />STRENGTH SYNTHETIC FILTER FABRICS, IT IS DESIGNED FOR SITUATIONS IN
<br />WHICH ONLY SHEET OR OVERLAND FLOWS ARE EXPECTED.
<br />1. THE HEIGHT OF A SILT FENCE SHALL NOT EXCEED 36 INCHES (HIGHER FENCES
<br />MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE
<br />STRUCTURE).
<br />2. THE FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL CUT TO
<br />THE LENGTH OF THE BARRIER TO AVOID THE USE OF JOINTS. WHEN JOINTS
<br />ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A
<br />SUPPORT POST, WITH A MINIMUM 6 -INCH OVERLAP, AND SECURELY SEALED.
<br />3. POSTS SHALL BE SPACED A MAXIMUM OF 6 FEET APART AT THE BARRIER
<br />LOCATION AND DRIVEN SECURELY INTO THE GROUND (MINIMUM OF 30 INCHES).
<br />4. A TRENCH SHALL BE EXCAVATED APPROXIMATELY 8 INCHES WIDE AND 12 INCHES
<br />DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER.
<br />5. WHEN STANDARD STRENGTH FILTER FABRIC IS USED, A WIRE MESH SUPPORT
<br />FENCE SHALL BE FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS
<br />USING HEAVY DUTY WIRE STAPLES AT LEAST 1 INCH LONG, TIE WIRES OR
<br />HOG RINGES. THE WIRE SHALL EXTEND INTO THE TRENCH A MINIMUM OF 4
<br />INCHES AND SHALL NOT EXTEND MORE THAN 36 INCHES ABOVE THE ORIGINAL
<br />GROUND SURFACE.
<br />6. THE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED TO
<br />THE FENCE, AND 20 INCHES OF THE FABRIC SHALL BE EXTENDED INTO THE
<br />TRENCH. THE FABRIC SHALL NOT EXTEND MORE THAN 36 INCHES ABOVE THE ORIGINAL
<br />GROUND SURFACE FILTER FABRIC SHALL NOT BE STAPLED TO EXISTING TREES
<br />7. WHEN EXTRA STRENGTH FILTER FRABRIC AND CLOSER POST SPACING ARE USED,
<br />THE WIRE MESH SUPPORT FENCE MAY BE ELIMINATED. IN SUCH A CASE, THE
<br />OTHER PROVISIONS OF ITEM NO. 6 APPLYING.
<br />8 THE TRENCH SHALL RE RACKFILLED WITH 3/4 INCH MINIMUM DIAMETER WASHED GRAVEL.
<br />9. SILT FENCE SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PUR-
<br />POSE, BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED
<br />MAINTENANCE:
<br />1. SILT FENCES AND FILTER BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER
<br />EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY
<br />REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY.
<br />2. SHOULD THE FABRIC ON A SILT FENCE OR FILTER BARRIER DECOMPOSE OR
<br />BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND
<br />THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY.
<br />3. SEDIMENT DEPOSITES SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY
<br />MUST BE REMOVED WHEN DEPOSITES REACH APPROXIMATELY ONE -HALF THE HEIGHT
<br />OF THE BARRIER.
<br />4. ANY SEDIMENT DEPOSITES REMAINING IN PLACE AFTER THE SILT FENCE OR
<br />FILTER BARRIER IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM
<br />WITH THE EXISTING GRADE, PREPARED AND SEEDED.
<br />GRAVEL FILTER
<br />RUNOFF WATER
<br />SEDIMENT -/
<br />CONCRETE GUTTER
<br />WIRE MESH
<br />� FILTERED
<br />\� CURB INLET
<br />1. HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2 INCH OPENINGS
<br />SHALL BE PLACED OVER THE CURB INLET OPENING SO THAT AT LEAST
<br />12 INCHES OF WIRE EXTENDS ACROSS THE INLET COVER AND AT LEAST
<br />12 INCHES OF WIRE EXTENDS ACROSS THE CONCRETE GUTTER FROM THE
<br />INLET OPENING, AS ILLUSTRATED.
<br />2. STONE SHALL BE PILED AGAINST THE WIRE SO AS TO ANCHOR IT AGAINST
<br />THE GUTTER AND INLET COVER AND TO COVER THE INLET OPENING COM-
<br />PLETELY. COARSE AGGREGATE (D 15= 1 -1/2 ". D50 = 2 -1/2 ",
<br />D85 = 3 -1/2 ") SHALL BE USED.
<br />3. IF THE STONE FILTER BECOMES CLOGGED WITH SEDIMENT SO THAT IT
<br />NO LONGER ADEQUATELY PERFORMS ITS FUNCTION, THE STONE MUST BE
<br />PULLED AWAY FROM THE BLOCK, CLEANED AND REPLACED.
<br />MAINTENANCE:
<br />1. THE STRUCTURE SHALL BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE
<br />AS NEEDED.
<br />2. SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL DIMEN-
<br />SIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE HALF OF THE DESIGN
<br />DEPTH OF THE TRAP. REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE
<br />AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE
<br />3. STRUCTURES SHALL BE REMOVED AND THE AREA STABILIZED WHEN THE REMAIN-
<br />ING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED.
<br />GRAVEL CURB INLET SEDIMENT FILTER
<br />NOT TO SCALE
<br />1' DEPTH 2 " -4"
<br />GRAVEL (12° M!N. DEPTH) ROCK -� 1' OVERFLOW
<br />- _ OUTFLOW CHANNEL
<br />r4' MINA DEPTH - IF CONSTRUCTED BY -
<br />RUNOFF WATER 3 _ EXCAVATION
<br />WITH SEDIMENT 1 r ----
<br />-- -
<br />�O 2' SETTLING DEPTH --
<br />3
<br />O 1.5' SEDIMENT % -• 1
<br />O STORAGE
<br />1' DEPTH FILTER FABRIC
<br />-�- - - 3/4 " -1 1/2" WASH FENCING
<br />• GRAVEL
<br />:4 'CROSS SECTION NOTE: MAY BE CONSTRUCTED BY
<br />WIRE MESH NOT 10 SCALE EXCAVATION OR BY BUILDING A BERM
<br />SEDIMENT CONSTRUCTION SPECIFICATIONS
<br />FILTERED ~
<br />WATER ft /t J ~ - 1. THE AREA UNDER THE EMBANKMENT SHALL BE CLEARED,
<br />- GRUBBED, AND STRIPPED OF ANY VEGETATION AND ROOT
<br />CONSTRUCTION SPECIFICATIONS:
<br />/ / // Spj�Rc MAT. TO FACILITATE CLEANOUT, THE POOL AREA SHOULD
<br />/ / / _ _
<br />BE CLEARED.
<br />1. WIRE MESH SHALL BE LAID OVER THE DROP INLET SO THAT THE WIRE
<br />EXTENDS A MINIMUM OF 1 FOOT BEYOND EACH SIDE OF THE INLET t// t/ t/I /// /// �20Ty 2 FILL MATERIAL FOR THE EMBANKMENT SHALL BE FREE OF
<br />STRUCTURE. HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 112 INCH // // l/ // // ROOTS OR OTHER WOODY VEGETATION, ORGANIC MATERIAL,
<br />OPENINGS SHALL BE USED. IF MORE THAN ONE STRIP OF MESH IS // ell LARGE STONES AND OTHER OBJECTIONABLE MATERIAL.
<br />NECESSARY, THE STRIPS SHALL BE OVERLAPPED. //t ! / THE EMBANKMENT SHOULD BE COMPACTED IN 8 -INCH LAYER
<br />BY TRAVERSING WITH CONSTRUCTION EQUIPMENT.
<br />2. COARSE AGGREGATE (D 1 =1.5 ", D =2.5 ", D gg =3.5") SHALL BE PLACED ft /�
<br />OVER THE WIRE MESH AS INDICATED5� . THE DEPTH OF STONE SHALL BE AT / Z lo 3. THE EARTHEN EMBANKMENT SHALL BE SEED WITH TEMPORARY
<br />LEAST 12 INCHES OVER THE ENTIRE INLET OPENING. THE STONE SHALL OR PERMANENT VEGETATION WITHIN 15 DAYS OF CONSTRUCTION
<br />EXTEND BEYOND THE INLET OPENING AT LEAST 18 INCHES ON ALL SIDES.
<br />3. IF THE STONE FILTER BECOMES CLOGGED WITH SEDIMENT SO THAT IT NO rl/ //, 1/t II/ If , //t 4. CONSTRUCTION OPERATIONS SHALL BE CARRIED OUT IN SUCH
<br />LONGER ADEQUATELY PERFORMS ITS FUNCTION, THE STONES MUST BE 1.5' SEDIMENT /, t/ // ,/ A MANNER THAT EROSION AND WATER POLLUTION ARE
<br />PULLED AWAY FROM THE INLET, CLEANED AND REPLACED. STORAGE MINIMIZED.
<br />' SETTLING DEPTH & J�'t� :t t�
<br />NOTE: THIS FILTERING DEVICE HAS NO OVERFLOW MECHANISM, THEREFORE, 2 t/, / /' S. THE STRUCTURE SHALL BE REMOVED AND THE AREA
<br />PONDING IS LIKELY ESPECIALLY IF SEDIMENT IS NOT REMOVED 1' DEPTH OF 2 -4" ROCK /, t,� STABILIZED WHEN THE UPSLOPE DRAINAGE AREA HAS BEEN
<br />REGULARLY. THIS TYPE OF DEVICE MUST NEVER BE USED WHERE 1' DEPTH OF 3/4 "- 1 - -1/2"
<br />OVERFLOW MAY ENDANGER AN EXPOSED FILL SLOPE. CONSIDERATION WASHED GRAVEL STABILIZED
<br />SHOULD ALSO BE GIVEN TO THE POSSIBLE EFFECTS OF PONDING ON 6. ALL CUT AND FILL SLOPES SHALL BE 2:1 OR FLATTER
<br />TRAFFIC MOVEMENT, NEARBY STRUCTURES, WORKING AREAS, ADJACENT
<br />PROPERTY, ETC.
<br />MAINTENANCE: SEDIMENT TRAP OUTLET MAINTENANCE:
<br />NOT TO SCALE 1. SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED
<br />1. THE STRUCTURE SHALL BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS
<br />AS NEEDED. ACCMULATED TO 112 THE DESIGN VOLUME OF THE TRAP,
<br />SEDIMENT REMOVED FROM THE BASIN SHALL BE DEPOSITED
<br />2. SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL IN A SUITABLE AREA IN SUCH A MANNER THAT IT MILL HALF OF
<br />WHEN THE DESIGN DIMENSIONS
<br />DEPTH OF THE TRAP.EREMOVEDASEDIMENT SHALL BE €DEPOSITED IN €A SILTATION POND NOT ERODE.
<br />SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE. 2. THE STRUCTURE SHOULD BE CHECKED REGULARLY TO INSURE
<br />3. STRUCTURES SHALL BE REMOVED AND THE AREA STABILIZED MEN THE THAT IT IS STRUCTURALLY SOUND AND HAS NOT BEEN DAMAGED
<br />REMAINING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. BY EROSION OR CONSTRUCTION EQUIPMENT. THE HEIGHT OF THE
<br />OUTLET SHOULD BE CHECKED TO INSURE THAT ITS CENTER IS
<br />AT LEAST ONE FOOT BELOW THE TOP OF EMBANKMENT.
<br />GRAVEL AND IMRE MESH
<br />DROP IryLET SEPIMENT FILTER
<br />" NOI T LE
<br />0
<br />CONSTRUCTION SPECIFICATIONS:
<br />1. THE DIVERSION SHALL BE CONSTRUCTED AT THE TOP OF THE FILL
<br />AT THE END OF EACH WORK DAY AS NEEDED
<br />2, IHE DIVERSION SHALL BE LOCATED AT LEAST 2 FEET INSIDE
<br />THE TOP EDGE OF THE FILL.
<br />3. THE SUPPORTING RIDGE OF THE LOWER SIDE SHALL BE CONSTRUCTED
<br />WITH A UNIFORM HEIGHT ALONG ITS ENTIRE LENGTH.
<br />MAINTENANCE:
<br />;INCE THE PRACTICE IS TEMPORARY AND UNDER MOST SITUATIONS WILL
<br />BE COVERED THE NEXT WORK DAY. THE MAINTENANCE REQUIRED SHOULD
<br />BE LOW. IF THE PRACTICE IS TO REMAIN IN USE FOR MORE THAN ONE
<br />DAY, AN INSPECTION WILL BE MADE AT THE END OF EACH WORK DAY AND
<br />REPAIRS MADE TO THE MEASURE IF NEEDED. THE CONTRACTOR SHOULD
<br />AVOID THE PLACEMENT OF ANY MATERIAL OVER THE STRUCTURE WHILE
<br />IT IS IN USE. CONSTRUCTION TRAFFIC SHOULD NOT BE PERMITTED TO
<br />CROSS THE DIVERSION.
<br />1. EXCAVATE THE T REN CH
<br />w-moii
<br />CLEAN GRANULAR MATERIAL, 3" MINUS
<br />GPF �7j�, `r SpF,o2,
<br />Sgt pti R
<br />PROVIDE FULL WIDTH OF___/
<br />INGRESS/EGRESS AREA
<br />CONSTRUCTION SPECIFICATIONS
<br />THE AREA OF THE ENTRANCE SHOULD BE CLEARED OF ALL VEGETATION, ROOTS,
<br />AND OTHER OBJECTIONABLE MATERIAL. THE GRAVEL SHALL BE PLACED TO THE
<br />SPECIFIED DIMENSIONS. ANY DRAINAGE FACILITIES REQUIRED BECAUSE OF WASHING
<br />SHOULD BE CONSTRUCTED ACCORDING TO SPECIFICATIONS. IF WASH RACKS ARE USE,
<br />THEY SHOULD BE INSTALLED ACCORDING TO MANUFACTURER'S SPECIFICATIONS.
<br />MAINTENANCE
<br />THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING
<br />OR FLOW OF MUD ONTO PUBLIC RIGHTS -OF -WAY. THIS MAY REQUIRE PERIODIC
<br />TOP DRESSING PATH 2 -INCH STONE, AS CONDITIONS DEMAND, AND REPAIR AND /OR
<br />CLEANOUT OF ANY STRUCTURES USED TO TRAP SEDIMENT. ALL MATERIALS SPILLED,
<br />DROPPED, WASHED, OR TRACKED FROM VEHICLE ONTO ROADWAYS OR INTO STORM
<br />DRAINS MUST BE REMOVED IMMEDIATELY.
<br />KUM • \ ► 0 4 9 1 1� �Y�7JS71
<br />2. PLACE AND STAKE STRAW BALES
<br />W W W
<br />W ( ^) W
<br />W
<br />IIIII\ y W W
<br />��IIli110H"111
<br />S (�IIIIII+IIi111j1411I111
<br />Ililinglllilllllllll .
<br />IIIIII�IIII����� 1j11111
<br />III��IIIIIIIIIIII
<br />3. WEDGE LOOSE STRAW BETWEEN
<br />BALES 4. BACKFILL AND COMPACT THE
<br />EXCAVATED SOIL.
<br />CONSTRUCTION OF A STRAW BALE BARRIER
<br />CONSTRUCTION SPECIFICATIONS:
<br />SHEET FLOW APPLICATIONS
<br />1. BALES SHALL BE PLACED IN A SINGLE ROW.
<br />LENGTHWISE ON THE CONTOUR, WITH ENDS OF
<br />ADJACENT BALES TIGHTLY ABUTTING ONE ANOTHER.
<br />2. ALL BAI -ES SHALL BE EITHER OR
<br />:STRING -TIED. STRAW BALES SHALL BE INSTALLED
<br />SO THAT BINDINGS ARE ORIENTED AROUND THE
<br />SIDES RATHER THAN ALONG THE TOPS AND BOTTOMS
<br />OF THE BALES (IN ORDER TO PREVENT
<br />DETERIORATION OF THE BINDINGS)
<br />3. THE BARRIER SHALL BE ENTRANCHED AND
<br />BACKFILLED. A TRENCH SHALL BE EXCAVATED THE
<br />WIDTH OF A BALE AND THE LENGTH OF THE
<br />PROPOSED BARRIER TO A MINIMUM DEPTH OF 4
<br />INCHES. AFTER THE BALES ARE STAKED AND CHINKED
<br />THE EXCAVATED SOIL SHALL BE BACKFILLED AGAINST
<br />THE BARRIER. BACKFILL SOIL SHALL CONFORM TO THE
<br />GROUND LEVEL ON THE DOWNHILL SIDE AND SHALL
<br />BE BUILT UP TO 4 INCHES AGAINST THE UPHILL
<br />SIDE OF THE BARRIER.
<br />4. EACH BALE SHALL BE SECURELY ANCHORED BY AT
<br />AT LEAST TWO STAKES OR REBARS DRIVEN THROUGH
<br />THE BALE. THE FIRST STAKE IN EACH BALE SHALL BE
<br />DRIVEN TOWARD PREVIOUSLY LAID BALE TO FORCE THE
<br />BALES TOGETHER. STAKES OF REBARS SHALL BE
<br />DRIVEN DEEP ENOUGH INTO THE GROUND TO SECURELY
<br />ANCHOR THE BALES
<br />5. THE GAPS BETWEEN BALES SHALL BE CHINKED (FILLED
<br />BY WEDGING) WITH STRAW TO PREVENT WATER FROM
<br />ESCAPING BETWEEN THE BALES. (LOOSE STRAW
<br />SCATTERED OVER THE AREA IMMEDIATELY UPHILL FROM
<br />A STRAW SALE BARRIER TENDS TO INCREASE BARRIER
<br />EFFICIENCY.
<br />6, INSPECTION SHALL BE FREQUENT AND. REPAIR OR
<br />REPLACEMENT SHALL BE MADE PROMPLTY AS NEEDED.
<br />7. STRAW BALE BARRIERS SHALL BE REMOVED WHEN
<br />THEY HAVE SERVED THEIR USEFULNESS, BUT NOT
<br />BEFORE THE UPSLOPE AREAS HAVE BEEN PERMANENTLY
<br />STABILIZED.
<br />CHANNEL FLOW APPLICATIONS
<br />1. BALES SHALL BE PLACED IN A SINGLE ROW, LENGTHWISE,
<br />ORIENTED PERPENDICULAR TO THE CONTOUR, WITH ENDS OF
<br />ADJACENT BALES TIGHTLY ABUTTING ONE ANOTHER.
<br />2. THE REMAINING STEPS FOR INSTALLING A STRAW BALE
<br />BARRIER FOR SHEET FLOW APPLICATIONS APPLY HERE, KITH
<br />WITH THE FOLLOWING ADDITION.
<br />3. THE BARRIER SHALL BE EXTENDED TO SUCH A LENGTH
<br />THAT THE BOTTOMS OF THE END BALES ARE HIGHER IN
<br />ELEVATION THAN THE TOP OF THE LOWEST BALE TO ASSURE
<br />THAT SEDIMENT -LADEN RUNOFF WILL FLOW EITHER THROUGH
<br />OR OVER THE BARRIER BUT NOT AROUND IT.
<br />MAINTENANCE:
<br />1. STRAW BALE BARRIERS SHALL BE INSPECTED IMMEDIATELY
<br />AFTER EACH RAINFALL AND AT LEAST DAILY DURING
<br />PROLONGED RAINFALL. '
<br />2. CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF
<br />DAMAGED BALES, END RUNS AND UNDERCUTTING
<br />BENEATH BALES.
<br />3. NECESSARY REPAIRS TO BARRIERS OR REPLACEMENT OF
<br />BALES SHALL BE ACCOMPLISHED PROMPTLY.
<br />4. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH
<br />RAINFALL. THEY MUST BE REMOVED WHEN THE LEVEL
<br />OF DEPOSITION REACHES APPROXIMATELY ONE -HALF THE
<br />HEIGHT OF THE BARRIER,
<br />5. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER
<br />THE STRAW BALE BARRIER IS NO LONGER REQUIRED
<br />SHALL BE DRESSED TO CONFIRM TO THE EXISITNG
<br />GRADE, PREPARED AND SEEDED.
<br />U
<br />i I i
<br />w
<br />D
<br />i
<br />! !
<br />(/]
<br />Q N
<br />i I =
<br />O
<br />z co
<br />1�j j❑
<br />O
<br />E
<br />o
<br />Ig
<br />d
<br />S�
<br />S
<br />to
<br />!
<br />o
<br />113
<br />X 0
<br />IZ 0
<br />X
<br />w O try
<br />C O
<br />A�
<br />", m Iti IU
<br />€m
<br />z_
<br />l�ll❑ ;El a!3
<br />LLJ I`
<br />�i.. I'
<br />N 0; W V!u"i Fl as
<br />to
<br />0010
<br />a
<br />otno
<br />CONSTRUCTION SPECIFICATIONS:
<br />SHEET FLOW APPLICATIONS
<br />1. BALES SHALL BE PLACED IN A SINGLE ROW.
<br />LENGTHWISE ON THE CONTOUR, WITH ENDS OF
<br />ADJACENT BALES TIGHTLY ABUTTING ONE ANOTHER.
<br />2. ALL BAI -ES SHALL BE EITHER OR
<br />:STRING -TIED. STRAW BALES SHALL BE INSTALLED
<br />SO THAT BINDINGS ARE ORIENTED AROUND THE
<br />SIDES RATHER THAN ALONG THE TOPS AND BOTTOMS
<br />OF THE BALES (IN ORDER TO PREVENT
<br />DETERIORATION OF THE BINDINGS)
<br />3. THE BARRIER SHALL BE ENTRANCHED AND
<br />BACKFILLED. A TRENCH SHALL BE EXCAVATED THE
<br />WIDTH OF A BALE AND THE LENGTH OF THE
<br />PROPOSED BARRIER TO A MINIMUM DEPTH OF 4
<br />INCHES. AFTER THE BALES ARE STAKED AND CHINKED
<br />THE EXCAVATED SOIL SHALL BE BACKFILLED AGAINST
<br />THE BARRIER. BACKFILL SOIL SHALL CONFORM TO THE
<br />GROUND LEVEL ON THE DOWNHILL SIDE AND SHALL
<br />BE BUILT UP TO 4 INCHES AGAINST THE UPHILL
<br />SIDE OF THE BARRIER.
<br />4. EACH BALE SHALL BE SECURELY ANCHORED BY AT
<br />AT LEAST TWO STAKES OR REBARS DRIVEN THROUGH
<br />THE BALE. THE FIRST STAKE IN EACH BALE SHALL BE
<br />DRIVEN TOWARD PREVIOUSLY LAID BALE TO FORCE THE
<br />BALES TOGETHER. STAKES OF REBARS SHALL BE
<br />DRIVEN DEEP ENOUGH INTO THE GROUND TO SECURELY
<br />ANCHOR THE BALES
<br />5. THE GAPS BETWEEN BALES SHALL BE CHINKED (FILLED
<br />BY WEDGING) WITH STRAW TO PREVENT WATER FROM
<br />ESCAPING BETWEEN THE BALES. (LOOSE STRAW
<br />SCATTERED OVER THE AREA IMMEDIATELY UPHILL FROM
<br />A STRAW SALE BARRIER TENDS TO INCREASE BARRIER
<br />EFFICIENCY.
<br />6, INSPECTION SHALL BE FREQUENT AND. REPAIR OR
<br />REPLACEMENT SHALL BE MADE PROMPLTY AS NEEDED.
<br />7. STRAW BALE BARRIERS SHALL BE REMOVED WHEN
<br />THEY HAVE SERVED THEIR USEFULNESS, BUT NOT
<br />BEFORE THE UPSLOPE AREAS HAVE BEEN PERMANENTLY
<br />STABILIZED.
<br />CHANNEL FLOW APPLICATIONS
<br />1. BALES SHALL BE PLACED IN A SINGLE ROW, LENGTHWISE,
<br />ORIENTED PERPENDICULAR TO THE CONTOUR, WITH ENDS OF
<br />ADJACENT BALES TIGHTLY ABUTTING ONE ANOTHER.
<br />2. THE REMAINING STEPS FOR INSTALLING A STRAW BALE
<br />BARRIER FOR SHEET FLOW APPLICATIONS APPLY HERE, KITH
<br />WITH THE FOLLOWING ADDITION.
<br />3. THE BARRIER SHALL BE EXTENDED TO SUCH A LENGTH
<br />THAT THE BOTTOMS OF THE END BALES ARE HIGHER IN
<br />ELEVATION THAN THE TOP OF THE LOWEST BALE TO ASSURE
<br />THAT SEDIMENT -LADEN RUNOFF WILL FLOW EITHER THROUGH
<br />OR OVER THE BARRIER BUT NOT AROUND IT.
<br />MAINTENANCE:
<br />1. STRAW BALE BARRIERS SHALL BE INSPECTED IMMEDIATELY
<br />AFTER EACH RAINFALL AND AT LEAST DAILY DURING
<br />PROLONGED RAINFALL. '
<br />2. CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF
<br />DAMAGED BALES, END RUNS AND UNDERCUTTING
<br />BENEATH BALES.
<br />3. NECESSARY REPAIRS TO BARRIERS OR REPLACEMENT OF
<br />BALES SHALL BE ACCOMPLISHED PROMPTLY.
<br />4. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH
<br />RAINFALL. THEY MUST BE REMOVED WHEN THE LEVEL
<br />OF DEPOSITION REACHES APPROXIMATELY ONE -HALF THE
<br />HEIGHT OF THE BARRIER,
<br />5. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER
<br />THE STRAW BALE BARRIER IS NO LONGER REQUIRED
<br />SHALL BE DRESSED TO CONFIRM TO THE EXISITNG
<br />GRADE, PREPARED AND SEEDED.
<br />U
<br />w
<br />D
<br />a
<br />rn
<br />(/]
<br />Q N
<br />(�]
<br />(~
<br />O
<br />z co
<br />O
<br />O
<br />d
<br />4 to
<br />Er rn
<br />X
<br />w O try
<br />A�
<br />NUM
<br />LLJ I`
<br />�W
<br />M
<br />rn5wh
<br />a
<br />>1
<br />pc
<br />I
<br />1
<br />0
<br />V
<br />J
<br />SCALE 1'40'
<br />lsLi
<br />LN
<br />C� ~
<br />I� N
<br />
|