Laserfiche WebLink
<br />• <br /> -6- <br /> Location in A lication <br /> INFORMATION CATEGORY NARRATIVE MAPS <br /> 2.05.3(7) Coal Handling Structures <br /> Page 91 <br /> 2.05.3(8) Coal Processing Waste and <br /> Non-Coal Processing Waste N/A <br /> 2.05.3(9) Underground Development <br /> Waste Pages 100-109 HGP-12, 13 <br /> 2.05.3(10) Return of Coal Processing <br /> Waste to Abandoned N/A <br /> Workings <br /> 2.05.4 Reclamation Plan Pages 107-114 <br /> 2.05.4(2)(a) Timetables <br /> Pages 106-107 <br /> 2.05.4(2)(b) Reclamation Cost Estimates <br /> Pages 112-114 <br /> 2.05.4(2)(c) Backfilling and Grading *Post-mining <br /> Page 108 topography - <br /> .05,4(2) ) <br /> 2.05.4(2)(d) Topsoil (Redistribution) Drawings 5-7, 9-12 <br /> Pages 108-109 <br /> 2.05.4(2)(e) Revegetation <br /> Pages 109-111 <br /> 2.05.4(2)(f) Disposal of Debris, Acid- <br /> Forming and Toxic-Forming N/A <br /> Materials <br /> 2.05.4(2)(8) Sealing or Managing Mine <br /> Openings, Exploration Page 108 Drawing 8 <br /> Holes, Other Boreholes or <br /> Wells <br /> 2.05.5 Post-mining Land Uses *Post-mining land <br /> 2.05.5(1)(c) use - <br /> Page 115 or (2)(c) HGP-6 <br /> 2.05.6 Mitigation of the Impacts <br /> of Mining Operations Pages 116-111 <br /> 2.05.6(1) Air Pollution t;ontrol Plan <br /> Aooen dix B <br />