Laserfiche WebLink
,.. <br />Y <br />:, <br />• • <br />STATE OF <br />III IIIIIIIIIIIIIIII <br />999 <br />COLORADO <br />MINED LAND RECLAMATION DIVISION <br />~ <br />Department of Natural Resources ~~o <br />Q <br /> <br /> <br />1313 Sherman St.. Room 215 <br />Nr; <br />$ <br /> <br />Denver, C0 80203 ` , <br />~\L' "~~ <br />303 866-3567 ~ r <br /> <br />FA X: 303 832.8106 g <br /> Roy Romer. <br /> Governor <br />February 20, 1992 Fretl R. Banta. <br /> Division Director <br />Mr. Xavier E Sandoval Commissioner <br />Huerfano County <br />401 Main Street <br />Walsenburg, CO 81089 <br />Re: M-92-003, Willis Pit, Permit Issuance <br />Dear Mr. Sandoval: <br />On February 7, 1992, the Mined Land Reclamation Division found Huerfano County <br />to have satisfied the applicable requirements of C.R.S. 34-32-101 et sec. for <br />obtaining a mining and reclamation permit. Therefore, a permit is being <br />issued. Two signed originals of the permit have been executed. We have kept <br />one copy for our files and are enclosing one copy for your use. Please read <br />the terms of the permit. It is your responsibility to comply with all of the <br />terms of the permit. As a reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, to <br />be an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, February 7, you must submit an <br />annual report to us. Please consult Rule 3.4 for 110 Permits, Rule 2.4 for <br />172 Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the <br />specific annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Sincer <br />MICHAEL B. LO <br />Division Director <br />MBL/ern <br />Enclosure(s) 6172G <br />