Laserfiche WebLink
Page 2 <br />Tha reclamation plan needs to addrata arch specific itima a• final sopea, <br />amount of topsoil available for reclamation, a specific sanding adrture <br />and asthod, a specific reclaimed sea or altarnatione, site drainage should <br />also be addressed. A zaviav of Kula 6 in the 8ulee sad Begulaiiane will <br />give an idea o! the bars ~+=1~~ necataary. Much of the above information <br />will also need to be ehovn on your reclamation plan map. <br />Information regarding source o! vatar used for dust control and the <br />crusher ehauld 6e supplied; this f.t also a request fsom the State &tgineere <br />office. You should also identify nay vatsr o0 or Haar the site, iY it <br />occurs at sll. <br />Soils information should also be supplied and should be sufficient to <br />identify physical characteristics (e.g. sandy, loam, etc.). Vegetation <br />existing on or surrounding the site should ba described oleo. <br />An eetimate of racl~ation cost needs to ba given: ea you realize, countiaa <br />are not required to poet bond if the county bq saeolution provides special <br />funds for reclamation. i have included a copq of such a resolution which <br />your Commissioners maq viah to ntiliae. <br />Local government approval ie required. Finally, a list of the partinata <br />permits, 6e they received or applied for shall be supplied. <br />G1tEEN VALLEY PIT. Our file d77-246. <br />All that vas discussed regarding the Pine Junction Pit ie applicable to the <br />Green Valley Pit to bring it up to adequate level. <br />DOG POUND PIT. Our file ~k77-244. <br />In addition Co the above mentioned items that also need to be included for <br />the Dog Pound pit, the situation surrounding the location of Clear Creek <br />needs to be discussed in much greater detail. <br />The kinds of detail I am referring to to how Clear Creek vill be lovered <br />eight feat, the kinds of design utilized to compensate for the flatter <br />gradient in the lovered portions and for the steeper gradlant in transitional <br />areas, channel design, rip-rap specifications, ahanael relocation scheduling, <br />affects expected on groundvatar levels, and Cha means by which the county <br />plena to compensate damaged aluvial veil utsre. Also the Water Resources <br />Division of the State Rnginesra office advises that you "must obtain <br />industrial or seining attar right" for use oY Clear Creek voter. <br />I regret that all of thaw items vats not brought up to you is the past; hov- <br />aver, for the staff to recommend approval of Jefferson County's applications. <br />theta iums do need to ba adequately addressed. If I can be oY any further <br />assistance, please do not hesitate to nontact ms. <br />Sincerely, <br />Randall J. Overton <br />Reclamation Specialist <br />BJOtpaa <br />Bnel~ at atatsd <br />