Laserfiche WebLink
ROADABLE EQUIPMENT ~ sheet 2 of 2 <br /> Nearest major city or town within project area region : Cortez <br />Transportation Cvcle Time : Non- Total one-way travel distance : 6.0 miles <br />Roadable Roadable Average travel speed : 45.0 mph <br />Haul time (hours) = 0.13 0.13 <br />Return time (hours) = 0.13 0.13 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 1.27 0.27 <br />Total non-roadable mob/demob cost * <br />' N+o round Mps with haul rig <br />Total roadable mob/demob cost ** <br />"one round trip, no haul rig <br />$1,348.90 <br />$12.56 <br />JOB TIME AND COST Total job time : 2.53 hours <br />Total job cost : $1 361 <br />EQUIPMENT HAUL DISTANCE and TIME <br />