Laserfiche WebLink
• <br />COAL HANDLING FACILITIES <br />12G motor grader <br />Total area = 1.50 Ac. <br />Productivity = 1.22 Ac./H r. <br />Cost Calculation = 1.50 Ac. _ 1.22 Ac./Hr. x $30.77/Hr. <br />RECLAMATION COST ESTIMATE <br /> <br />RIPPING THE REGRADED SURFACE <br />$ 37.83 <br />$ 37.83 <br />12G motor grader <br />Total area = 1.50 Ac. <br />Productivity = 1.22 Ac./H r. <br />Cost Calculation = 1.50 Ac. 1.22 Ac./Hr. x $30.77/Hr. <br />• <br />TOPSOIL REPLACEMENT <br />$ 220.14 <br />6216 scraper <br />Topsoil volume = 1210 Cu. Yd. <br />Productivity = 383 BCY/H r. <br />Cost Calculation = 1210 BCY 383 BCY/Hr. x $69.68/Hr. <br />SEEDBED PREPARATION <br />Total area = 1.50 Ac. <br />Average cost for seedbed preparation = $16.50/Ac. <br />Cost Calculation = 1.50 Ac. x $16.50/Ac. <br />$ 24.75 <br />• <br />