My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100569
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100569
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:13 PM
Creation date
11/24/2007 7:11:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000032
IBM Index Class Name
Permit File
Doc Date
6/9/2000
Doc Name
CONSTRUCTION MATERIALS REGULAR 112 OPERATION RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u <br />Exhibit D <br />Mining Plan <br />• Revision N I -Page 4 0(30 <br />(aJ Descriptions oflhe methods oj~mining to be employed in each stage of [he operations as related [o the <br />surface disturbance on aJjected lands; <br />The proposed sand and gravel mining pit property is approximately 38 acres in size, and is a square <br />shaped property one quarter mile in size (1280 ft by 1280 ft). With the Ciry of Grand Junction, <br />setbacks and buffers requirements, 32.5 acres will be mined for sand and gravel. <br />The sand and gravel will be progressively mined across the permit area using open pit mining <br />techniques. As mining for the sand and gavel at the highwall azea is performed, the mined areas <br />behind the highwall will be backfilled using overburden from the next mined area and imported inett <br />fill. As the backfill material is placed to fmal grade, the areas will be prepared for site reclamation. <br />The mining operations will utilize standard heavy construction equipment during the sand and gravel <br />mining operation. This includes equipment such as trackhoe excavators, Gont-end loaders, scrapers, <br />graders, compactors, water trucks, dump trucks, rock crushers, conveyors, etc. The sand and gravel <br />material will be crushed, screened, and stockpiled at the permit site. The operations will not be <br />producing "washed" rock products. <br />A portable scale facility will be located near the southwest comer of the site to track materials removed <br />from the project site. <br />Surface disturbance activities and disturbed areas are listed below: <br />ACTIVITY MAX. DISTURBED AREA (ACRES) <br />Haul Roads/Scales I <br />Topsoil Stripping 15 <br />Process Equipment (In Topsoil Stripped Area) 5 <br />Material Stockpiles (In Topsoil Stripped Area) 5 <br />Active Mining JBackfill Area (In Topsoil Stripped Area) 3 <br />Settlement Ponds I <br />Tvnica! Seuuence OJOnerations: <br />(I) The area to be mined, material stockpile areas, and processing areas will be stripped of the <br />existing top two to six inches of topsoil. The topsoil material will be stockpiled in the buffer <br />areas near the mined azea. The stripped topsoil area will be no larger than 15 acres in size. <br />The total volume of stockpiled topsoil is approximately 6.000 cubic yards. <br />(2) Next, the overburden in the excavation pit area will be removed. The overburden highwall <br />area is anticipated to be approximately 400-If long and 12-ft tall. The overburden will <br />typically be hauled and used as backfill material behind the active sand and gravel highwall <br />area. However, until a highwall area is constructed, the overburden material will need to be <br />temporary stockpiled until area has been mined and is ready for backfill. Overburden removal <br />operations will occur slightly ahead of the sand and gravel highwall area to minimize <br />overburden from sloughing off into active sand and gravel highwall area. <br />(3) The sand and gravel materials [o be mined are expected to be located at and below the <br />groundwater table elevation. Therefore, in order to mine the sand and gravel and place the <br />backfill material in the previously mined areas, the excavation pit area will need to be <br />dewatered. Portable pumps will be used to dewater this area, and they will be moved as the <br />
The URL can be used to link to this page
Your browser does not support the video tag.