Laserfiche WebLink
Tab 14 <br /> RECLAMATION PLAN <br /> Rule Description Page <br /> 2.05.4(2) Reclamation Plan ............................................. 14-1 <br /> List of Tables <br /> 14-1 Reclamation Soils Balances & Areas <br /> 14-2 Stockpile Volumes & Redistribution <br /> 14-3 Temporary Seed Mixture <br /> 14-4 Permanent Seed Mixture <br /> 145 1999 Vegetation Sampling <br /> 14-6 Permanent Seed Mix for 2 West Portals and South Fan <br /> 14-7 RDRDA Borrow Area - Quantity Calculation <br /> 14-8 Permanent Seed Mixture -Lowland and Upland Components <br /> List of Figures <br /> 14-1 Reclamation Timetable <br /> 14-2 Permanent Mine Seal <br /> 14-3 Permanent Drill Hole Seal <br /> 14-4 Refuse Pile Animal Habitat <br /> 14-5 RSDA South End Rirrap Ditch <br /> 14-6 Roadside South Portal Mine Water Discharge System <br /> 14-7 Roadside South Portal Dewatering Schematic <br /> 14-8 Mine Dewatering -Plan and Profile <br /> 14-9 Roadside South Portal -Mine Inflow Rate Determination <br /> 14-10 North Decline Mine Discharge System -Flow Calculation <br /> 1411 Siphon System -Flow Calculation without Siphon Influence <br /> <br />• 14-12 <br />14-13 Debris Fin <br />Cameo Borrow Area No <br />1 <br /> . <br /> List of Appendices <br /> 14-1 BLM-Proposal for Revegetation Research Project <br /> 14-2 Reclamation Plan Cost Estimate <br /> 14-3 Reclamation Costs, Cameo Refuse Disposal Areas No. 2 and other Areas <br /> 14-4 Other Reclamation Cost Estimates <br /> 14-5 Affected Land Owners Reclamation Approval <br /> 14-6 Final Reclamation Drainage Design <br /> 14-7 Revegetation Evaluation -Diversity <br /> List of Exhibits <br /> RS-11-008 Roadside Mine Revegetation Field Trials of Refuse Pile <br /> 6C Roadside Mine-Post Mining Topography <br /> 7C Overland Conveyor-Past Mining Topography <br /> 8C Cameo No. 1 Mine-Post Mining Topography <br /> 9C Cameo Refuse Disposal Area-Post Mining Topography <br /> 10C Railroad Spur & Overland Conveyor-Post Mining Topography <br /> 11C Unit Train Loadout Facility-Post Mining Topography <br /> 12C North Decline-Post Mining Topography <br /> 13C North West Intake Post Mining Topography <br /> 6D Roadside South Portal (January 20, 1977 Contours) <br /> 8D Roadside North Portal (May, 1977 Contours) <br /> 11 D Unit Train Loading Facility (January 20, 1977 Contours) <br /> 26 Roadside Mine Cross Sections <br /> <br />• 27 <br />28 Cameo No. 1 Mine Cross Sections <br />North Decline Cross Sections <br /> CMC Mining Inc. January 20, 1975-Topography Map (MR05,Vo1 7) <br /> 59 Unit Train Loading Facility <br />3/02 <br />