My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100532
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100532
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:12 PM
Creation date
11/24/2007 7:09:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041A
IBM Index Class Name
Permit File
Doc Date
5/13/2002
Doc Name
TOC TO APPENDIX 14-1
Section_Exhibit Name
TAB 14 Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Roadside North Portal <br />Final contours for the Roadside North Portal area are shown on Exhibit <br />8C. Cross-sections representing the existing and final grade are shown on <br />Exhibit 27. These final contours closely resemble the original contours, <br />see Exhibit 8D for the pre-mining contours. Grading of this area will <br />primarily involve backfilling the portal decline (subsequent to sealing). <br />The backfill material will come from areas filled near Coal Creek and <br />around the stockpile area. Coal remaining in the stockpile area will be <br />sold or hauled to the refuse disposal area. Dirt and rock placed in the <br />decline will be spread in approximately 2-4' lifts and in such a way as to <br />minimize voids in the fill. There will be no specific compaction <br />requirements and lifts may be at any angle less than the angle of draw of <br />the material. The small amount of settling that will take place with this fill <br />technique will have little affect on the final contours and drainage. <br />Concrete and other material left after demolition of the facilities will be <br />placed in the fill material. Once the fill and general site grading is <br />completed, topsoil from Topsoil piles 1 and 3 will be distributed. <br />• The sediment pond and silt fence shown on Exhibit 8C will be utilized for <br />sediment control at the North portal after the site is restored to <br />approximate original contour. The pond and silt fence will remain in place <br />until their removal is approved by the DMG. At that time the pond will be <br />backfilled, the silt fence removed and the berms rounded or removed. <br />The upper diversion ditch will be reclaimed after the sediment pond is <br />removed. <br />Cameo Refuse Disposal Area Nos. 1, 2 and 3 <br />Reclamation of the remaining benches and the top of the Cameo Refuse <br />Disposal Areas (CRDA) will be scheduled as discussed in section (a) of <br />this Tab Section. The final contours for this sites are shown on Exhibit <br />9C, this section and Exhibits 51, 52 and 60 located in Tab Section 13. <br />Cross-sections representing the existing and final grade are shown on <br />Exhibits 18 and 53, Tab Section 13. These contours reflect a design final <br />configuration rather than an almost original contour. Design for the slopes <br />• and benches is given in Tab Section 13 along with Exhibits 18 and 51 <br />through 53 and 60. <br />~; <br />
The URL can be used to link to this page
Your browser does not support the video tag.