Laserfiche WebLink
• <br />EXHIBIT "D" <br />Mining Plan <br />• <br />1. The method of mining is open pit with a front-end loader <br />used to remove gravel and dirt. The rock is crushed at the <br />site and hauled to County areas needing gravel. <br />2. There is no water diversion or impoundment <br />3. Major disturbance 1.83 acres <br />Moderate disturbance None <br />Plinor or no disturbance 8.07 acres <br />(Area to be mined) <br />4. A timetable is difficult to determine since gravel is <br />mined on an as needed basis. It is contemplated that <br />approximately 8.07 acres will be mined within the next <br />2-5 years. <br />5. The gravel body is 10-12 feet deep lying over shale. <br /> <br />