My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100486
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100486
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:11 PM
Creation date
11/24/2007 7:07:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
4/8/2005
Section_Exhibit Name
2.05 Operation and Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~• Sediment pond MB-2R is designed to accept mine water and storm water runoff. This pond also <br />accepts runoff from the Lower Refuse Pile and treated discharge from the Waste Water <br />Treatment Plant. MB-2R is lined with a geotextile liner. There are four sediment traps that <br />water flows through prior to entering MB-2R. Two aze neaz the breaker building to pre-treat <br />(settle) wash-down water from the conveyors, reclaim tunnel, and other similaz facilities. The <br />third and forth sediment traps are located immediately above the western and eastern inlet to the <br />ponds. The pond has been designed to store sediment for three veazs. Other than the increased <br />amount of sediment that resulted from the lazge mine water inflow event in 1997, MCC's <br />experience has been that the pond does not require cleaning that often. The pond was last <br />cleaned of sediment during the fourth quarter of 1998. A 48-inch;riser pipe serves as the primary <br />spillway for MB-2R, and contains three inlets at different elevations. The bottom two inlets aze <br />gated for controlled discharges, while the highest inlet (the top of the riser pipe) is open. The <br />middle inlet serves as the primary discharge. The emergency spillway is anopen-channel, rock <br />lined spillway. MB-2R is sized to contain the 100-yeaz, 24-hour storm event, and/or MCC's <br />water right for this pond. Piping is in place to allow water from MB-2R to be conveyed to the <br />Raw Water Intake for mine water use. <br />Sediment pond MB-3 is designed to accept storm water runoff and wash down water from the <br />silos. A sediment trap has been constructed above the inlet to MB-3. The pond was designed to <br />• contain three years of sediment, but MCC's experience has been that the pond does not require <br />cleaning that often. This pond was last cleaned during the third! quarter of 1998. This pond is <br />also lined with a geotextile liner. There aze two gated inlets at different elevations that serve as <br />primary dischazge. The emergency spillway is anopen-channel, rock-lined spillway. MB-3 has <br />been sized to contain the 25-yeaz storm event and hold MCC's storage right. <br />Sediment pond MB-4 has been designed to accommodate storm water runoff and wash-down <br />water from the train loadout facility. The sediment control system was redesigned and <br />constructed in 1998 and 1999. The new system includes a concrete sediment trap, an oil <br />skimmer, and a concrete sediment pond. In addition, an oil catckiment trench was constructed to <br />capture lazger spills of hydraulic oil. Wash down water is piped directly to the sediment trap. <br />The pond was designed to hold three yeazs of sediment that could be generated during a storm <br />event. As the pond has just been constructed, MCC cannot evaluate the frequency of cleaning <br />that may be required. The pond is designed to contain the runoff volume from a 10-yeaz, 24-hour <br />storm event. The primary dischazge structure is a gated HDPE pipe. The emergency spillway is <br />also a HDPE pipe, but is not gated. <br />~. DQB-d <br />7.05-32 November 1004 PRII <br />
The URL can be used to link to this page
Your browser does not support the video tag.