Laserfiche WebLink
a,as, 3C3~ <br />U~VVVJG4 tlN I~LLL Q1CO, lllY <br />~ections. and the following: <br />(i~...._____.__Specifcations__for__each.., road__width,_ road„gradient,__road,_surface .__road___cut,._fill <br />- .. .. <br />embankment, culvert, budge, dramage_dltch, and drainage_structure, <br />(ii) A report of appropriate aeotechnical anal~s, where approval of the Division is <br />required for alternative specifications. or for steep cut slopes under 4.03.2(1)(3). or 4.03 2(3)(d). <br />(iv) A description of measures, other than use of a rock headwall, to be taken to protect <br />the_inlet_end_ofa_ditch_reliefculver[,.for_approyal, by the_Division_under 4:03;, 1,(4)(e).(yi)(c), <br />(y)„.„.,.,.._A_description_of_measures, to_be__used_to_ensure_that_the, jnterests_of the,.public_and <br />landowners affected are protected if, under 2.07.6(2)(d)(iv), the applicant seeks to have the Division approve: <br />(A) Conducting the proposed surface mining activities within 100 feet of the <br />right-of way,line_ofany,public.road,_exceptwhere_mine_ac,~.e..ss_or_haul..roads.join_that,right-0f-way;,,or <br />{B)__.__.__.._Relocation_the_public_road, <br />(vi) Drawings and specifications for any stream fords oronosed for use as temporary <br />contraction routes. <br />(vii) The plans and drawings for each haul road and access road shall be prepared by, or <br />under the direction of, and certified by a qualified, registered professional engineer, experienced in the design and <br />construction of roads, as meeting the requirements of this rule; current, prudent engineering practices; and the <br />design criteria of 4.03.1 and 4.03.2. <br />RESPONSE <br />Five types of roads will be utilized for the surface facilities; namely, 1) access/haulroad, II) haulroad, III) access <br />roads, IV) east/west ramps to the portal area and V) light-use roads such as those to the powerline substation. <br />Locations of roads are shown on Map 24, Surface Facilities; Map 26, Fish Creek Borehole Area Facilities and <br />Access Road; Map 29, Reclamation; And Map 39, Substation and Powerline Location. <br />I. Access/Haulroad <br />The access/haulroad is shown on Map 24, Surface Facilities and Map 24A, Road Location and Classification . The <br />access/haulroad was constructed with a minimum of 36 inches of compacted road fill topped with a 12 inch gravel <br />based and 6 inches of gravel surfacing. The road fill consists of mine spoils, contains less than 25 percent rock <br />larger than 6 inches and was spread in successive uniform layers not exceeding 12 inches prior to compaction. No <br />lifts were superimposed on the previous layer until the design density was achieved throughout the layer. Fill <br />material was not dumped in final position, but was bladed for proper compaction. <br />Posted vehicle speed on the access/haulroad will not exceed 30 mph. However, the horizontal alignment has been <br />determined based on a 40 mph design speed for safety reasons. Horizontal and vertical alignment have been <br />carefully_ coordinated so that no horizontal curve begins or ends at the crest or sag_of a vertical curve and in such a <br />.manner as to control erosion, simplify drainage design, maximize safety and environmental protection. <br />~- r~pPROVED APR 2 4 2000 <br />Permit Renewal No. 3 2.05-66 1/15/00 <br />