My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100282
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100282
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:04 PM
Creation date
11/24/2007 6:57:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
10/10/2003
Doc Name
pages 2.05-65 to 2.05-122.1
Section_Exhibit Name
2.05 Operations Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The access/haulroad was surfaced with gravel to form a durable road surface. The gravel <br />• characteristics conform to the following specifications: <br />Screen Size Material Passing <br />1?/z inch 100% <br />linch 75-90% <br />3/8 inch 40-75% <br />No. 4 mesh 30-60% <br />No. 10 mesh 20-45% <br />No. 40 mesh 15-30% <br />*No. 200 mesh 5-15% <br />*The fraction passing the No. 200 mesh shall not be greater than two-thirds of the fraction <br />passing the No. 40 mesh. <br />Acid and/or toxic forming substances were not used in the road surfacing. <br />Vegetation was cleared for no more than the width needed for the roadway and drainage control. <br />A cross-section and centerline profile of the access/haulroad is shown on Map 30, Road Profiles <br />and Cross-Sections. Grade and pitch requirements were not exceeded in road design or <br />construction. <br />Embankment materials utilized conformed to applicable standards. No excess or unsuitable <br />material from excavations was encountered. No acid and toxic-forming materials were <br />• encountered during embankment construction. Construction activities of the access/haulroad <br />were conducted in accordance with the approved permit C-82-056. As-built P.E. certification for <br />this access/haulroad may be found in Exhibit 25, As-built Certifications of Access/Haulroad and <br />Haulroad. <br />Access/Haulroad Surfacing (MR 03-184) <br />Twentymile is planning on surfacing the existing access haulroad with a 4 or 5 inch asphalt matt. <br />The matt will be approximately 30 feet wide, except adjacent to the office building where it will <br />be up to 45 feet in width. Minor subgrade preparation be completed prior to placement to the <br />asphalt matt. Exhibit 48-3 contains a report addressing surfacing recommendations for the road. <br />H. Haulroad <br />A haulroad was constructed to connect the TCC haulroad with the CYCC haulroad B. The <br />location of the haulroad is shown on Map 24, Surface Facilities. The centerline road profile and <br />typical cross-section are shown on Map 30, Road Profiles and Cross sections. <br />Road design specifications are as described below and comply with Rule 4.03.1, Haul Roads. the <br />planned activity will not be conducted within 100 feet of a public right-of--way of any public road <br />and will not require relocation of a public road. <br />Drainage ditches have been constructed at the toe of all cut slopes formed by the construction of <br />the haulroad with relief cross drains spaced according to the grade. The road is crowned to <br />prevent ponding of water. Surface dips have been used in conjunction with the ditches to control <br />• erosion where required by Rule 4 <br />MR 03-184 2.05-67 05/28/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.