My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100282
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100282
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:04 PM
Creation date
11/24/2007 6:57:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
10/10/2003
Doc Name
pages 2.05-65 to 2.05-122.1
Section_Exhibit Name
2.05 Operations Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
previously reported for the Fish Creek Borehole. TCC will continue to monitor the concentration, and anticipates the <br />concentration to return to historic levels by late summer, 2000 or 2001. <br />• In regazds to future impacts, TCC will not discontinue pumping of the underground sump for the extended <br />periods of time. This will eliminate the potential for the above situation to occur in the future. Once <br />mining is completed at the facility, no further discharging will occur. Based upon this, there should be no <br />impact to the postmining land use. <br />(9) ReWrn of Coal Mine R'asle to Abandoned Workings <br />(a Each plan shall describe the design. operation and maintenance of am' propused coal <br />processing mine waste disposal facility, including Flow diagrams and any vlher necessary drawim~s and maps, which <br />must meet [he standards of 2.10, for the approval of both the Division and [he Mine Safety and Health Administration <br />in accordance with 4.11.3. <br />(b) Each plan shall describe [he source and qualih~ of waste to be stored. area to be backlilled. <br />percent of the mint roid to be tilled, method of constmcting underground retaining walls, influence of the backfilling <br />operation on active underground mine operations, surface area to be supported by the backlill, and the anticipated <br />occun~ence of surface effects following backfillinR. <br />(c) The applicant shall describe the source of hydraulic trmtspon medium, method of dewa[erine <br />the placed backlill. retainment of water underground, treatment of water if released to surface streams, and the etTect on <br />the Irodrvlo¢ic regime. <br />dl The plan shall describe each permanent monitoring well to be located in the backlilled <br />area. the stratum underlying the mined coal. and gradient from the backlilled area. <br />• (e) fhe requirements of 2.053 shall also apply to pneumatic backfilling operations, except <br />where the operations are exempted by [he Division from requirements specifying hydrologic monitoring. <br />RESPONSE <br />TCC is planning on returning the thickener underflow generated at the Prep Plant to the abandoned <br />workings located in the Eastern Mining District. The location of the area to receive the underflow is shown <br />on Map 23. In the plant the thickener underflow goes to a filter press for dewatering, and then this material <br />is combined with the course refuse and hauled to the refuse pile for placement. It is TCC's intent to pump <br />the thickener underflow into the abandoned mine works as opposed to mixing it with the course refuse for <br />placement in the refuse pile. The thickener underflow is typically a 25 percent solids (17.8 tons per hour), <br />214 gallons per minute flow mixture of ash and coal fines (28 mesh x 0). The mixture would be piped to <br />the abandoned works located in the EMD, where the fines would settle out and the water would be recycled <br />back to the wash plant via the mine sump for settling. Map 24 shows where the water will be pumped back <br />outside and recycled to the plant. <br />The quality of the thickener underflow that will be piped to the underground workings is typically 25 <br />percent ash and 75 percent coal fines material (28 mesh x 0). Also, Exhibit 9C, Underflow Chemical <br />Characterization, provides data on selected chemical constituents found in the underflow. The underflow is <br />moved in a slurry flowing approximately 214 gallons per minute. The water quality of the slurry is the <br />typical spoils water generated at the adjacent Colorado Yampa Coal Company. It is TCC's intent that the <br />water used to slurry the mixture underground will be recycled to the plant as make-up water. <br />• Map 23 shows the area that will be filled with the refuse material over the next 20-year period. The percent <br />of the EMD abandoned workings that will contain these refuse fines, after the typical annual production for <br />a 20-year period, will be 1.63 percent. This is based on 25,000 tons of refuse fines generated per year and <br />TR 01-39 2.05-97.1 09/17/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.