My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100282
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100282
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:04 PM
Creation date
11/24/2007 6:57:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
10/10/2003
Doc Name
pages 2.05-65 to 2.05-122.1
Section_Exhibit Name
2.05 Operations Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
they will be grouted from the bottom to the top to stabilize them in the hole. !n order to hang the <br />• power cable in the hole a steel structure will be constructed over two or three of the cased holes. <br />(The additional holes borings are discussed in the following paragraph.) These structures aze ~ <br />metal beams supported on metals legs, which are bolted into a concrete footer. The beams will be `~ r,,,) <br />either l4' (one each) or 10' (up to three) feet in length, and the legs will be approximately 6.5' or i ~" <br />8' in height. The footers are approximately 4' x 4' x 4'. The 14' beam structures will be placed <br />over the 24" borehole. Also, a 7' x 10' by .3' pad will be poured around the 24' borehole. The <br />10" beam structures will be placed over the 6" diameter borings. A 7' x 6' x .3' pad will be <br />poured around these borings. <br />As part of the above, TCC will advance up to throe additional 6 inch cased borings at the existing <br />NMD Power Borehole. This is required due to problems encountered in grouting the casing as <br />approved in TR 00-37. These borings will be located on the same pad as the NMD Power <br />Borehole, as they will terminate in the same entry underground as the NMD Power Borehole. <br />During the boring of the holes the existing mud pit will be utilized, although it will require that it <br />be dug out and reestablished at the site. It is in the same location as it was originally located. <br />When the borings aze complete the pit will be backfilled and the pad graded as per the above. <br />connection with or to facilitate the surface coal mining and reclamation operations. The <br />description shall include: <br />(il (A) Location: <br />• (Bl Plans of the structure which describe its current <br />condition• <br />(Cl Approximate dates on which construction of the existing <br />structure was begun and completed: and <br />D) A showine. includine relevant monitoring data or other <br />evidence. whether the structure meets the desigrr <br />requirements or performance standards of Rule 4 or is <br />elieible for exemption from the desien requirements as set <br />forth in 2.07.6 <br />(ii) A wmpliance plan for each existing structure that is <br />proposed to be modified or reconstructed for use in connection <br />with or to facilitate the surface coal mining and reclamation <br />operation. The com~ance plan shall include: <br />(Al Desi r s~ifications for the modification or <br />reconstruction of the structure to meet the requirements of these Rules: <br />(Bl A construction schedule which shows dates for <br />beginning and competing interim steps and final reconstruction: <br />(C1 Provisions for monitoring the structure during and after <br />modification or reconstruction to ensure that the performance standards of these Rules are met; <br />. and <br />fU~'rf~~FJ~:? F,UG 1 9 2000 <br />MR 00-169 2.05-65.3 08/01/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.