My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100282
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100282
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:04 PM
Creation date
11/24/2007 6:57:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
10/10/2003
Doc Name
pages 2.05-65 to 2.05-122.1
Section_Exhibit Name
2.05 Operations Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EASTERN MINING DISTRICT <br />• The Eastern Mining District Dewatering Facility will require salvaging and stockpiling approximately 13,360 CY <br />of topsoil from the access road and the facility site. During upgrading of the road, approximately 3,600 CY of <br />topsoil will be windrowed to the side of the road. The topsoil along the length of the road is approximately 30 <br />inches deep. The facility site will require salvaging and stockpiling approximately 8,300 CY of topsoil. The <br />topsoil from the site area is approximately 30 inches deep. A test pit will be dug to verify the topsoil depth <br />obtained from previous soil mapping work. the stockpiled topsoil, which is located within the pad area, will be <br />stabilized with the topsoil stockpile stabilizing seed mixture. Additionally, approximately 6,295 CY of topsoil will <br />be salvaged from the treatment pond site. This site has been relocated closer to the road to facilitate delivery of <br />chemicals. <br />Bleeder Fan <br />The bleeder fan facility will require salvaging and stockpiling approximately 4,700 CY of topsoil from the access <br />road and the facility site. During the upgrading of the road, approximatel}• 2,800 CY of topsoil will be <br />windrowed to the side of the road and left in place. The 1,200 CY that will be salvaged from the road extension <br />will be placed in the stockpile that will be established on the fan pad. In addition to the topsoil stockpiled from the <br />road extension, approximately 740 CY will be salvaged and stockpiled from the pad. The soil resources <br />information was derived from information presented in Exhibits 7 and 8, Soil Profile Description and Soil Mapping <br />Unit Descriptions, Map No. 19, Mine No. 3, Soils presented in permit C-84-062. These materials are incorporated <br />herein by reference. At the bleeder fan site, Twentymile will establish a test pit to verify topsoil depths prior to <br /> <br />C 1 <br />TR 01-39 <br />2.05-84.1 <br />8/10/O] <br />Z- <br />
The URL can be used to link to this page
Your browser does not support the video tag.