embankment. The area is well vegetated and has crock-check dam, which will additionally filter surface runoffprior to <br />• discharge. <br />Overland Belt West - this area is comprised of some 0.5 acres between the haulroad embankment and railroad tracks <br />west ofthe Hautroad C rail crossing. Estimated runoff for the 10 yrfZ4 hr event would be same 0.03 acre-feet from this <br />area, and will be treated by means of a rock filter. This should be more than sufficient, given that drainage for the area <br />is neazly static, <br />Haulroad C to_psoil~ile -covets approximately 0.3 acres between the haulroad and Foidel Creek, and is located across <br />from Pond C. Runoff from the area is filtered by established vegetative cover. TCC will also inscribe a bemt and install <br />rock filters to further treat the anticipated 0.01 AF of ntnoff for the 10 yr/24 hr event from this area. <br /># 7 North Esca__pe Shaft -covers 1.82 anus of disturbance and is located in the SE 1/4, Section 20, TSN, R86W, 6th <br />P.M. on Cochetopa Loam (a C soil). SAE demonstrations have characterized four areas: the north outslope, the east <br />and west outslopes, the south side of the topsoil pile, and the pad, which incorporates drainage from the north side of <br />the topsoil pile, the cutslope, the berm, the pad, and road drainage from the road. Sediment control will be achieved by <br />seeding and mulching the pad outslopes, the cutslopes, and the topsoil pile, and by placing strawbale dikes or a silt <br />fence below each of these locations to prevent off-site migration of sediment prior to vegetative stabilization. <br />Vegetative filters will provide adequate sediment detention to achieve effluent limitations following a 10-year 24-hour <br />storm event for these locations. Rock check dams wilt be installed at the southeast corner of the topsoil pile and below <br />a riprapped Swale descending the northeast corner of the outslope. Peak flows from a i 0-year 24-hour storm are 0.06 <br />cfs, 0.03 cfs, 0.42 cfs, and 1.59 cfs for the north outstope, east or west outslope, north side of the topsoil pile, and pad, <br />respectively. <br />EMD Ventilation Shaft -covers approximately 2.66 acres of disturbance and is located in the NW,SE, Sec. 14, TSN, <br />• R86W, 6th P.M. on Routt loam (a C soil). SAE demonstrations have characterized three areas: the east side of the East <br />topsoil pile; the south and west sides of the Southwest topsoil pile; and other topsoil slopes and the benches and cut and <br />fill slopes of the facility itself. Sediment control will be achieved through the installation of an upland clean water <br />diversion ditch that will not cant' any water from disturbed azeas, by seeding and mulching the topsoil piles and cut and <br />fill slopes with 2 tons/acre straw and graveling the pads and roads with gravel adequate to achieve 80% cover. <br />Vegetative filters will provide adequate sediment detention to achieve effluent limitations following a 10-year 24-hour <br />stomr event. Peak flows from this storm are 0.05 cfs, 027 cfs, and ].96 cfs for the east side of the East topsoil pile, the <br />south and wes! sides of the Southwest topsoil pile, other topsoil slopes, and the benches and cut and fill slopes of the <br />facility, respectively. <br />Pond T Toasoil Stockpile -covers some 0.5 acres between the Pond T embankment face and railroad spur. Runoff <br />form this area flows downslope between the railroad embankment and Pond T face to the Pond T weir. From there, <br />flow is conveyed under the track by means of a culvert to Foidel Creek. Vegetative filtering is provided by the <br />establishment of good vegetation on the topsoil pile and in the conveyance below the topsoil stockpile. Additional <br />filtering of sediment is provided by a rock filter between the stockpile and the culvert, benches, and cut and fill <br />slopes of the facility itself. Sediment control will be achieved through the installation of an upland clean water <br />diversion ditch that will not carry any water from disturbed areas, by seeding and mulching the topsoil piles and cut and <br />fill slopes with 2 tonslacre straw and graveling the pads and roads with gravel adequate to achieve 80 % wver. <br />Vegetative filters will provide adequate sediment detention to achieve effluent limitations following a 10-year 24-hour <br />storm event. Peak flows from this storm aze 0.05 efs, 0,27 cfs, and 1.96 cfs for the east side of the Fast topsoil pile, the <br />south and west sides of the Southwest topsoil pile, other topsoil slopes, and the benches and cut and fill slopes of the <br />facility, respectively. <br /> <br />APFP.~3~/a~i A°R 2 '[ 20Cii <br />Permit Renewal No. 3 2.05-82 11/1199 <br />