Laserfiche WebLink
• iii iuiii~iiiiuiii • <br />~ IATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER ov~co~ <br />Division of Water Resources ~~'~ <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 '•~~.. <br />Denver, Colorado 80203 rate <br />Phone (3031 866-3581 <br />FAX (3031866-3589 ReS onse to Reclamation Permit A l~catlon Consideration Roy Romer <br />p PP Goxernor <br />lames S. Eochhead <br />Executive Director <br />DATE: November 4, 1996 RECEIVED HaI D. Simpson <br />TO: Carl B. Mount, Senior Environmental Protection Specialist Sole Engineer <br />CC: Division 1 Office; District 5 Water Commissioner N~V 0 4 <br />FROM: Megan Sullivan, E.I.T. ~1 <br />RE: Bamard Quarry Pit, File No. M-96-079 i-)ivioion Pf rdinttrdlp 4 wvpip~y <br />Operator: Barnard Quames, Contact: Chester Bamard, <br />Barnard Quarries, 245 Evans St., PO Box 86, Lyons, CO, <br />80540,303/823-6977 <br />Section 1, Twp 3 N, Rng 71 W, 6th P.M., Boulder County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other: . <br />Prior to initiation of these uses of ground +Wter, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then obtain <br />a waiver of objection from all well o+mers with wells +vithin 600 feet of the pernli[ area or request a <br />hearing before the State Engineer, <br />® Other: Applicant indicated that there would be no water requirements at the site. Ho+vever, should <br />water be used, the applicant will need to provide evidence to this office that [he water is pemlitted, <br />decreed or otherwise legally available for any proposed use. <br />COMMENTS: <br />