Laserfiche WebLink
-3- <br />10. Primary future _ Cropland<CR) Pastureland(PL) General Agriculture(GA> <br /> (Post-mining> Rangeland(RL) _ <br />_ Forestry(FR) _ <br />Wildlife Habitat(WL) <br /> 'land use y;Y Residenttal(RS> Recreatlon(RC> _ <br />Industrial/Commerciai(IC) <br /> (check one): _ Developed Water Resources(WR) _ Solid Waste Disposal(WD) <br />11. Primary rp esent _ Cropland(CR) X~( Pastureland(PL) General Agriculture(GA> <br /> 'land use <br />~ Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> (check one): Residential(RS) _ <br />Recreation(RC) _ <br />_ Industrial/Commerctal(IC) <br /> _ Developed Water Resources(WR) <br />12. Method of Mining: _ Quarry lQ R> _ Solution (SO> <br /> 12a. Other: Briefly explain mining method (e.g. Placer, truck/shovel). Material <br /> will be excavated using front-end loaders and scrapers and screened and crushed <br /> on site. <br />13. On Site Processing: Solut ion (SO) Chemic al (CH) <br />Thermal (TH) <br /> _ Heap Leach (HL) _ Vat Le _ <br />ach (VL) <br />14. Application Fee: <br />The application fee for quarry mining is E2,325. <br />The application fee for solution mining or any chemical or thermal processing <br />is 53,100. <br />If none of these methods or processes are to be included in the operation then the <br />application fee 1s 51,875. <br />An applicant will not be issued a reclamation permit until notified by the Division that <br />this application and the required performance and financial warranties have been <br />approved. Alternatively, an automatic approval rill occur where the Division fails to <br />notify the applicant/operator that the application has been dented. The final agency <br />action must be made within 120 calendar days from the date the application vas <br />submitted. However, the performance and financial rarranties must be approved by the <br />Division or Board before a permit rill be issued even if you receive an automatic <br />approval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT IS ISSUED (Rule 7.2(2)>. <br />It shall be a provision of this permit that the operations will be conducted in <br />accordance with the terms and conditions listed 1n your application, as cell as with the <br />provisions of the Act and the Mineral Rules and Regulations in effect at the time the <br />permit is issued. <br />