Laserfiche WebLink
Benson Brothers Pig Mesa Pit <br />DMG 112 Application <br />Exhibit L -Reclamation Costs <br />Earthwork: High-wall reduction 25ft vert. to 3:1 slope x 1800ft 1.33 swell = 20781 cy <br />Cat D9R estimated at 1019 cy/hr@ $180/hr = $3,671 <br />Replace overburden Cat 633E Series2 Scraper @$401/hr x <br />8" on 20 acres 21,51 lcy/1320 cy/hr for 400 foot avg haul = $6,535 <br />Replace topsoil Cat 633E Series2 Scraper @$401/hr x <br />8" on 20 acres 21,51 lcy/1320 cy/hr for 400 foot avg haul = $6,535 <br />Grade 20 acres Cat 14H grader @ $108/hr x 20ac/1.3 ac/hr =$1,662 <br />Mobilization 5 miles one way <br />Subtotal <br />_ $2,000 <br />_ $20,403 <br />Overhead and Profit Subtotal x 17% <br />Total Contract <br />DMG Management 5% of Total Contract <br />Total Bond Amount <br />_ $ 3,469 <br />_ $23,872 <br />_ $ 1,194 <br />_ $25,066 <br />