Laserfiche WebLink
• PRS Reclamation Bond-Miscellaneous Costs <br />Pond Cleaning During Liability Period <br />Assumptions: <br />During first year -eight weeks of pond Leaning required <br />Dudng second year -three weeks of pond cleaning <br />No pond Leaning required years 3-10 <br />Costs: <br />Equipment Type Ownership Op & OH Operator Total <br /> <br />CAT 3228 hydr. Exc. $22.57 $30.06 $30.65 $83.28 <br />End Dump Haul Trucc (10 cyd) $10.25 $20.85 $24.80 $55.90 <br />End Dump Haul Truck (10 cyd) $10.25 $20.85 $24.80 $55.90 <br />Total Cost per Hour <br />Year one hours <br />Year one cost <br />Year two hours <br />Year iwo cost <br />Total Cost <br />• <br />$43.07 $71.76 <br />320 <br />$ 62,426 <br />120 <br />$ 23,410 <br />$ 85,835 <br />$80.25 $195.08 <br />~J <br />C?~3o(p3 <br />