Laserfiche WebLink
Table MR 196-1. Average cosUfoo! for Flintlock Pit haulroads regrade. <br /> Regrade Costs <br /> Unit Unit <br />Haulroad Hauiroad Hours Cost Hours Cost Average <br />Designation Length Ripping' ($/hr)" Grading` ($/hr)" $/ft <br /> <br />F2 3,300 56 226.60 55 213.59 7.41 <br />F3 2,200 37 226.60 37 213.59 7.40 <br />F4 3,000 51 226.60 50 213.59 7.41 <br />F5 1,300 22 226.60 22 213.59 7.45 <br />Total 9,800 166 226.60 164 213.59 7.41 <br />'See permit Table 1.4-5. <br />"See permit Table 1.4-2, <br />Revised projected F1 haulroad regrade costs (66 feet wide): <br />2200 feet multiplied by $7.41/foot = $16,302. <br />• Projected F1 haulroad regrade cost (33 feet wide) <br />1500 feet multiplied by $3.71/foot = $5,565. <br />Projected FO haulroad regrade cost (33 feet wide) <br />1900 feet multiplied by $3.71/foot = $7,049. <br />Total F1 and FO projected regrade cost = 28 916 <br />~~' 19~ <br />ApP'R.AVED OGT 21 200V <br />