My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100231
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:02 PM
Creation date
11/24/2007 6:54:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
10/21/2004
Section_Exhibit Name
Appendix A Bonding
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table MR 196-1. Average cosUfoo! for Flintlock Pit haulroads regrade. <br /> Regrade Costs <br /> Unit Unit <br />Haulroad Hauiroad Hours Cost Hours Cost Average <br />Designation Length Ripping' ($/hr)" Grading` ($/hr)" $/ft <br /> <br />F2 3,300 56 226.60 55 213.59 7.41 <br />F3 2,200 37 226.60 37 213.59 7.40 <br />F4 3,000 51 226.60 50 213.59 7.41 <br />F5 1,300 22 226.60 22 213.59 7.45 <br />Total 9,800 166 226.60 164 213.59 7.41 <br />'See permit Table 1.4-5. <br />"See permit Table 1.4-2, <br />Revised projected F1 haulroad regrade costs (66 feet wide): <br />2200 feet multiplied by $7.41/foot = $16,302. <br />• Projected F1 haulroad regrade cost (33 feet wide) <br />1500 feet multiplied by $3.71/foot = $5,565. <br />Projected FO haulroad regrade cost (33 feet wide) <br />1900 feet multiplied by $3.71/foot = $7,049. <br />Total F1 and FO projected regrade cost = 28 916 <br />~~' 19~ <br />ApP'R.AVED OGT 21 200V <br />
The URL can be used to link to this page
Your browser does not support the video tag.