Laserfiche WebLink
Trapper Monitoring Wells -Costs to Seal Wells <br />Unit Costs <br />Drill Water Flatbed Pickup Dozer <br />Mobile Equipment Rig Truck Tmck Truck (D7HJ <br />Ownership Cost/hr = $ 141.04 $ 41.77 $ 39.57 $ 33.14 $ 86 <br />Materials & <br />ru~uauu iyyc ii ~.cwwu <br />Dry t.rranulaz Bentoni[e <br />Surgel Abandonment Fluid <br />Octo Plug <br />Mazker <br />u <br /> <br />Itemized Task Breakdown and Associated Costs <br />Borehole or Project I.D.: Trapper Monitoring Wells <br />Total number of Holes = 54 No. Plugs/hole = <br />Task Item Task Descr <br />Unit lug set up over hole, pump starry, move to next <br />Water Truck standby, use water, refill, move to next hole <br />Flatbed Truck standby, store cement & bentonite <br />Pickup Truck transport personnel <br />Dozer regrade area <br />Cement Used for aquifer and grotmdwater plug <br />Bentonite Used for volume between cement plugs <br />Surgel <br />Octo-plug Used to seperate cement/bentonite regions <br />Mazker Need one on each hole <br />Miscellaneous <br />$/unit unit cf/unit <br />~p /.VV /VII J4Vl~ J <br />$ 6.00 100# sack 3 <br />$ 6.00 100# sack 3 <br />$ 4.35 each <br />$ 2.00 each <br />I <br />Unit $/unit Cost <br />1.0 hts/hole $ 41.77 $ 2,256 <br />0.5 hrs/hole $ 39.57 $ 1,068 <br />1.0 hrs/hole $ 33.14 $ 1,790 <br />1.0 hrs/hole $ 86.04 $ 4,646 <br />16.0 sacks $ 9.00 $ 144 <br />356.6 sacks $ 6.00 $ 2,139 <br /> $ 6.00 $ - <br />1.0 /hole S 4.35 $ 235 <br />1.0 /hole $ 2.00 $ 108 <br />TotalLL= $ 35,234 <br />~G1ea ~a"~ - ~ `~o <br />•~-c~.c- t~2-S <br />PR4\wells.xls; costs <br />(~(3o~c~ <br />