Laserfiche WebLink
<br />BELVEAL GRAVEL PIT <br />- 4 - <br />MaD9 ~ EZh1b].ts' <br />Submit two (2) complete, unbound copies of the following application exhibits: <br />6.3.1 EXHIBIT A - Legal Description and Location Map <br />6.3.2 EXHIBIT B - Site Description <br />6.3.3 EXHIBIT C - Mining Plan <br />6.3.4 EXHIBIT D - Reclamation Plan <br />6.3.5 EXHIBIT E - Maps, to include the location of any recorded easements <br />6.3.6 EXHIBIT F - List of Other Permits and Licenses Required <br />6.3.7 EXHIBIT G - Source of Legal Right-to-Enter, to include holders of any recorded <br /> easements ~ <br /> <br />6.3.8 <br />EXHIBIT <br />H - <br />Municipalities Within a Two-mile Radius - ~~,.:~;,~ n <br />~.~.~T.y~- . <br />6.3.9 EXHIBIT I - Proof of Filing with County Clerk a ~ ~'.Y.7 '-~ k~' ...~ •-' ~; •~ <br />6.3.10 EXHIBIT J - Proof of Mailing Notices of Permit Application <br />6.3.12 EXHIBIT L - Permanent Man-Made Structures <br />1.6.2(1)(b) ADDENDUM 1 - Notice Requirements (sample enclosed) <br />6.5 Geotechnical Stability Exhibit (as required) <br />ResDOnsibilities as a Permittee: <br />Upon application approval and permit issuance, this application becomes a legally <br />binding document. Therefore, there are a number of important requirements which you, <br />as a permittee, should fully understand. These requirements are listed below. Please <br />r ad and initial a.h 7>>irement, in the space provided, to acknowledge that you <br />understand your obligations. If you do not understand these obligations then please <br />contact this Office for a full explanation. <br />~S 1. Your obligation to reclaim the site is not limited to the amount of the <br />financial warranty. You assume legal liability for all reasonable expenses <br />which the Board or the Office may incur to reclaim the affected lands associated <br />with your mining operation in the event your permit is revoked and financial <br />warranty is forfeited; <br />.j ~~ 2. The Board may suspend or revoke this permit, or assess a civil penalty, upon <br />a finding that the permittee violated the terms or conditions of this permit, <br />the Act, the Mineral Rules and Regulations, or that information contained in the <br />application or your permit misrepresent important material facts; <br />L 3. If your mining and reclamation operations affect areas beyond the boundaries <br />of an approved permit boundary, substantial civil penalties, to you as permittee <br />can result; <br />i '7 4. Any modification to the approved mining and reclamation plan from those <br />described in your approved application requires you to submit a permit <br />modification and obtain approval from the Board or Office; <br />~_ 5. It is your responsibility to notify the Office of any changes in your <br />address or phone number; <br />~~' 6. Upon permit issuance and prior to beginning on-site mining acti•rity, you <br />must post a sign at the entrznce of the mine site, which shall be c1e=_rly <br />visible from the access road, with the following information (Rule 3.1.12)• <br />a. the name of the operator; <br />