Laserfiche WebLink
Table 7-1-7 • <br />Calculated Impacts to Fish Creek Based on Spoil Discharge <br />and Chemical Measurements Made in the Cow Camp Creek Drainage <br />(Site 004) and the Bond Creek Drainage (Site SW-S2-9) <br />Fish Creek Below Cow Camo Creek <br />June 1.2762 tons + 26.0304 tons = 27.3066 = 433 mg/1 <br />0.9285 AF/day + 5.4336 AF/day x .0013 0.06305 <br />433 mg/1 - 421 mg/1 = 12 mg/1 increase in TDS <br />July 0.7821 tans + 12.8080 tons = 13.5901 = 557 mg/1 <br />0. 897 AF/day + 17.6576 AF/day x .00136 <br />557 mg/1 - 533 mg/1 = 24 mg/1 increase in TDS <br />Fish Creek Below Bond Creek <br />June 0.0232 tons + 29.0628 tons = 29.0860 = 460 mg/1 • <br />0.0317 AF/day + 46.4256 AF/day x .00136 0.0632 <br />460 mg/1 - 460 mg/1 = 0 mg/1 increase in TDS <br />July 0.0367 tons + 14.0295 tons = 14.0662 = 571.6 mg/1 <br />0.0436 AF/day + 18.0544 AF/day x .00136 0.0246 <br />571.6 mg/1 - 571 mg/1 = 0.6 mg/1 increase in TDS <br /> <br />7-1-10 Revised 05/16/88 <br />