Laserfiche WebLink
<br />HAYDEN GULCH LOADOUT <br />TR-06 - June 2005 <br />RECLAMATION HOND CALCULATION - SUMMARY SHEET Past 1 of 2 <br />DIRECT COSTS <br />Hackfilling and Grading <br />Regsade Loop Track = $42,292 <br />Regsade Rail Spur = $29,767 <br />Regrade Facilities Area = $15,241 <br />Rip Facilities Area = $3,420 <br />Haul Roads (Rip and Regrade) _ $3,580 <br />Access Road (Rip and Regsade) _ $2,703 <br />Regrade Leach Field = $1,829 <br />Regrade Sediment Ponds = $2,329 <br />Regrade Drainage Ditches = $4,560 <br />Finish Grading $8,863 <br />Total eackfilling S Grading = $114,574 <br />Topsoil Replacement <br />Topsoil Rail Loop and Facilities Area = $84,149 <br />Topsoil Rail Spur = $15,709 <br />Total Topsoil Replacement = $99,853 <br />Revegetation <br />Facilities Area Revegetation $80,695 <br />Total Revegetation = ~ $80,695 <br />Facilities <br />Structure Demolition = $454,418 <br />Well Abandonment $733 <br />Culverts = $75,230 <br />Total Facilities ~ _ $530,381 <br />Miscellaneous Items <br />Repair Rills and Gullys = $6,924 <br />Clean Sediment Ponds = $4,568 <br />Mobilization and Demobilization $7,330 <br />Total Miscellaneous $18,822 <br />TOTAL DIRECT COSTS $849,326 <br />TR-07 8 Revised 03/06 <br />