Laserfiche WebLink
<br />1 1 <br />L_~ <br />CHAPTER 23 <br />BONDING <br />Introduction <br />The purpose of this section is to provide a reclamation cost estimate, with <br />supporting documentation, for determining the reclamation performance bond for <br />lands disturbed at the Hayden Gulch Loadout facility. This document will <br />provide information regarding all disturbed lands within the proposed permit <br />boundary. The amount of bond required was developed assuming that the bond <br />would be forfeited and the CDMG would assume the reclamation liability. The <br />bond calculation was developed by CDMG during their adequacy review of Technical <br />Revision No. 6 (TR-06), which was approved by the CDMG in June 2005. <br />The CDMG's calculations, costs, and backup documentation for all disturbed lands <br />and facilities are located in Attachment 23-1 Hond Estimate Worksheets. <br />Reclamation Cost Categories <br />Experience in reclaiming lands has shown, for the purpose of estimating costs, <br />contract reclamation activities can be grouped into the following categories: <br />Direct Costs <br />1. Backfilling and grading <br />2. Topsoil replacement <br />3. Revegetation <br />9. Facility reclamation <br />I• <br />Indirect Costs <br />1. Mobilization and demobilization <br />2. Engineering redesign fee <br />3. Contractor profit and overhead <br />4. Reclamation management fee <br />5. Public liability insurance <br />6. Contractors performance bond <br />TR-07 <br />1 <br />Revised 03/06 <br />