Laserfiche WebLink
•SRI•J.:TURN R R ID~9703851375 - JRN 20'98 lE•~48 No.007 P.pB <br />-3- - <br />~ 6. The parties agree to try and resolve .conflicts at the operating <br />-- manager level. Any unresolved conflicts will be reported to Che State <br />Director, BLM and to the Director of the Colorado Department of Natural <br />Resources for further consideration. <br />V. Inspection <br />1. The Board will be the point of contact in dealing with the <br />operator concerning operations and compliance with the requirements covered by <br />this Memorandum. <br />2. The BLM will periodically monitor operations for compliance with <br />permit conditions and other Federal Requirements. Any evidence of <br />noncompliance with the permit and State _law or regulation will be fcrwarded to <br />the CMLRS for necessary action. - <br />3. Final inspections of operations will be preceded by notice, from <br />either perty of intent to inspect. Final inspections will be jointly <br />conducted to the extent permitted by agency schedules and perscnnel <br />availability. Any inspec~ion reports wail b_e exchanged to facilitate revieH <br />of the operation. <br />VI. Enforcement <br />1. Enforcement actions by C1wLR8 will satisfy BLM obll9ation5 under <br />43 CFR 3809.3-2. BLM retains authority to undertake•any enforcement action <br />~~ against operations involving NHPA, Endangered Species Act, and NEPA, as well <br />_ as those operations where it has sole jurisdiction (i.e. access routes that <br />lie outside of CMLRS permit boundaries). <br />2. The administering agencies will promptly notify each other of <br />all violations of applicable laws, regulations, orders, approved permits, <br />plans, licenses, or notices subject to this. Memorandum, and of all appropriate <br />actions taken with respect to such violations. <br />YII. Bonding <br />T. Reclamation bonds will be issued in the name of the State of <br />Colorado and will be held and administered by the CMLRS. <br />2. Bonds will not be released, in whole or in part, until the BLM <br />has advised the CMLRS that the reclamation work has been completed in a manner <br />satisfactory to the BLM. A Drovision to that effect will be Included in the <br />State bond form as paragraph 11(c). <br />3. Upon default, the State, to the extent pr actlcable with the • <br />proceeds rreceived under the bond, will cause the reclamation work to be <br />performed in accordance with the reclamation standards set out in the approved <br />plan. <br /> <br />