Laserfiche WebLink
<br />WHITE BANKS MINE <br />Exweir D <br />Labor: 2 men, 2 days, ] 0 hrs/day, $8/hr: $ 320 <br />Portal sealing (assuming current standard MSI-IA sealing requirements for non-coal mines): <br />Concrete blocks, 225, $1.30 each: $ 293 <br />Mortar, 5 sacks, $6 each: $ 30 <br />Labor: 2 men, 1 day, 10 hrs/day, $10/ly: $ 200 <br />Backfilling: included in grading above. <br />Equipment removal, power line removal, structure dismantling, general cleanup: <br />General Labor: 3 men, 5 days, ] 0 hrs/day, $10/hr: <br />$ 1,500 <br />Crane (remove block crane, bathhouse trailer, miner, power line, etc.): <br />'/~ day, 5 hrs, @ $200/hr: $ 1,000 <br />Front-end loader (Cat 966 or equivalent; remove <br />concrete crane supports, load fighter equipment and scrap, etc.): <br />1 day, 10 hrs/day @ $120/hr: $ 1,200 <br />Site sediment control: <br />Straw bales: est. 100 bales @ $1.50/bale delivered = $ 150 <br />Stakesrtwine, etc.: est = $ 150 <br />Labor: one mgn, 8 hrs, @ $10/hr = $ 80 <br />TOTAL DIRECT- RECLAMATION COST: $ 6,447 <br />6.3.4(2) Equipment Cost Requirements. <br />Page 5 <br />Estimated heavy equipment rental costs are equal to or in excess of the going rate for renting such <br />equipment, with operator, in the GarSeld County area. This hourly rate includes operator wages and <br />beneSts; fuel and lubricants; depreciation; and mobilization and demobilization. <br /> <br />.v 1u1, 19. 1999 (Il OVM <br />