My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100069
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:54:57 PM
Creation date
11/24/2007 6:47:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
5/19/2003
Doc Name
Colorado Discharge Permit Certification for COG-850008
Section_Exhibit Name
Tab 13 Appendix 13-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />PART 1 <br />Pagc No. 7 <br />Pcrmit No. COG-BSODOq <br />Stormwater Management Plan (SWMP~ (continued) <br />c. Erosion and Sediment Controls - Descnbe BMPs that will be used io reduce erosion and prevent sediment deliveryto State <br />waters. These should include stmctwal (such as silt fences, sediment ponds, drop structures, check dams) and non- <br />stmctwal (such as mulching and revegetation) methods. <br />Whenever a facility or a portion ofa facility enters the post-mining phase, it is likely that the overall co~gwation ofthe <br />site will change considerably. Prior to the time when new vegetation becomes established, the surface areas will be subject <br />to potentially significant erosion. The permittee will need to take adequate measwes in order to minimize this erosion as <br />well as the erosion normally encountered during mining activities. <br />d. Identification of Discharges other than Stormwater -The stormwater conveyance system on the site shall be evaluated for <br />the presence of discharges other than storrnwater, such as mine drainage, spoil springs, sanitary waste, or process water of <br />any kind. The SWMP shall include a description of the results of any evaluation for the presence of discharges other than <br />stormwater, the method used, the date of the evaluation, and the on-site drainage points that were drrectly observed during <br />the evaluation. <br />b) Facility Inspections <br />Qualified personnel identified by the operator shall make a comprehensive inspection of [heir stormwater management system, at <br />]east twice per year (in the spring and fall), except as provided in paragraphs d and a,below. These comprehensive inspections must <br />be documented and summarized in the Annual Report (see Part I.D.2. of the permit). <br />I} Material handling areas, distwbed areas, areas used for maieriai storage that are exposed to precipitation, and other potential <br />sowces ofpollution identified in the SWMP in accordance with Part ].B.2.a)1) of this permit shall be inspected for evidence ot; <br />or the potential for, pollutants entering the drainage system. Stmctwal stormwater management measwes, sediment and control <br />measwes, and other stmctwal pollution prevention measwes identified in the plan shall be observed to enswe that they are <br />operating correctly. A visual inspection of equipment needed to implement the plan, such as spill response equipment, shall be <br />made. <br />2) Based on the results of the inspection, the description of potential pollutant sowces and pollution prevention measwes identified <br />in the plan shall be revised as appropriate within two weeks of such inspection. Such revisions shall provide for implementation <br />of any changes to the plan in a timely manner, but in no case more than 90 days after the inspection. <br />3) A report summarizing the scope of the inspection, personnel making the inspection, the date(s) of the inspection, major <br />observations relating to the implementation of the SWMP, and actions taken in accordance with paragraph (b), above, shall be <br />made and retained as pan ofthe SWMP for at least three years. The report shall be signed in accordance with Part I.D.7. ofthis <br />permit. <br />4) Where semi-annual site inspections are shown in the plan to be impractical for sites where an employee is not stationed or does <br />not routinely visit the site, inspections as required in this part shall be conducted at appropriate intervals specified in the plan, <br />but never less than once in two yeazs. <br />5) Where semi-annual site inspections are shown in the plan to be impractical for inactive sites (sites where industrial activity is tro <br />longer conducted), site inspections required by this pari shall be conducted at appropriate intervals specified in the plan, but, in <br />no case less than once in three years. At lease one site inspection required under this part shall be conducted before October 1, <br />1999, or the date two years after such site becomes inactive, whichever is earlier. <br />c) Additional SWMP Reguuemen[s <br />1) Signatory Requirements: A copy of the plan shall be signed in accordance with Part I.D.7. and retained on site. <br />2) SWMP Review/Changes: Upon review of the SWMP, the Division may notify the pertnittee at any time drat the plan does not <br />meet one or more of the minimum requuements of this permit. After such notification, the permittee shall make changes to the <br />• plan and shall submit to the Division an update to the plan including the requested changes. Unless otherwise provided bythe <br />Division, the perrnittee shall have 30 days after such notification to both make the necessary changes to the plan and to <br />implement them. <br />
The URL can be used to link to this page
Your browser does not support the video tag.