Laserfiche WebLink
PART 1 <br />Pagc No. 5 <br />Pcrtnit No. COG-850000 <br />EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />Effluent Limitations <br />b. Post-Minine Outfalls <br />Post-mining limitations may apply to outfalls serving surface areas, which have been returned to the requred contour and on which <br />revegetation (specifically, seeding or planting) work has commenced. The perminee may request consideration for change from <br />active mining limitations to post-mining ]imitations when these conditions have been met. <br />POST-MINING PRIMARY LIMITATIONS <br />"" " ;Parameter <br />_. ~- • . ~' Lrinitation <br /> <br />~ ~ ~ ~~ <br />Flow,MGD Repori <br />'Settleable Solids, ml/1 0.5 <br />pH, s.u. 6.5-9.0 <br />Oil and Grease, mg/1 10 <br />Total Dissolved Solids, mg/1•• Report <br />Total Phosphorus (as P), mg/1••• Report <br />POST-MINING ALTERNATE LIMITATIONS <br />Any discharge or increase in the volume of a discharge caused by precipitation within any 24-hour period Rreater than the 10-vear, <br />24-hour~recinitation event (or snowmelt of equivalent volume) may comply with the following limitations --subject to burden of <br />proof requirements described in Part I.B.I.d). <br />N `Pazameter i _ n>~z._._ r ';,r[ , , '..-w° , <br />Flow, MGD Repori <br />'Settleable Solids, ml/I Report <br />pH, s.u. 6.5-9.0 <br />• Oil and Grease, mg/1 ] 0 <br />Total Dissolved Solids, mg/1•' Report <br />?oral Phosphorus (as P), mg/1••• Report <br />"If discharge is to land, TSS and settleable solids monitoring is waved. ''Applies only to drainages within the Colorado Rivcr Basin <br />"'Applies only to drainages directly above Chatfield Resmoir, Cherry Creek Resmoir, Dillon Reservoir, or Upper Bcar Creek <br />c. Genera] Limitations -Active and Post-Mining Outfa]]s <br />1) There shall be no discharge of sanitary wastewaters from toilets of related facilities. <br />2) There shall be no discharge of floating solids or visrble foam in other than trace amounts. <br />3) There shall be no ]and application of wastewater other than for dust control. <br />4) No chemicals shall be added to the discharge unless the Division grants specific approval <br />d. Burden of Proof Reouirements <br />The pemtittee has the burden of proof when requesting relief from total suspended solids (TSS), total iron, total manganese, and/or <br />settleable solids limitations. Relief shall be granted only when necessary and shall not be granted when the permittee has control <br />over the discharge. The permittee should endeavor to meet the primary ]imitations whenever possible. The Division shall have final <br />authority in determining whether relief is granted. <br />1) For rainfall, to waive TSS, total iron, and total manganese limitations, it is necessary to demonstrate that discharge occured <br />within 48 hours after measurable precipitation has stopped. To waive settleable solids limitations, it is necessary to prove that <br />discharge occured within 48 hotus after precipitation greater than the ]0-yeaz, 24-hour event has stopped. <br />2) For snowmelt, to waive TSS, total iron, and total manganese ]imitations, it is necessary to demonstrate that discharge occured <br />within 48 hours after pond inflow has stopped. To waive settleable solids limitations, it is necessary to prove that discharge <br />occured within 48 hours after pond inflow volume greater than the ] 0-yeaz, 24-hour event has stopped. <br />• The Division shall determine the adequacy of proof. As part of this determination, the Division shall evaluate whether the permittee <br />could have controlled the discharge in such a manner that primary limitations could have been met. All manual dewatering ofponds <br />that aze equipped with automatic dewatering systems must meet TSS, total iron, and total manganese limitations. If a pond has only <br />manual dewatering capability, relief is available only to the extent required to regain necessary stability and capacity, <br />See Part LC. for Defmitions <br />