Laserfiche WebLink
Page 2 <br />Mr. Robart W. Shields <br />January 25, 1980 <br />E. Since Lorimer County Approval is conditional upon submission of a hydro- <br />logical study and road improvement plan, we will need proof that these <br />conditions were met to the county's satisfac~-.ion. Until this is done, <br />we would not be able to recommend approval of this application at the <br />March 4-6, 1980, meeting of the Mined Land Reclamation Board. County <br />approval is a requitement prior to Board consideration. <br />F. Until Lorimer County does approve the asphalt and concrete batch plants, <br />these items will have to be removed from the application. <br />G. Exhibit L - Reclamation Costa <br />1. Please further break down the submitted major, moderate and minor <br />disturbance into types of disturbance (pond, stockpile, roads, etc.), <br />amount of acres for each type and the amount of topsoil stockpiled <br />to be replaced (in cubic yards) at any one time. See page 16 (212(4) <br />p) in the Rules and Regulations. <br />Enclosed is a copy of the Rules and Regulations as you requested. The February <br />27-28, 1980, meeting .of the 2~[ined Land Reclamation Board has been moved to <br />March 4-6, 1980. <br />If there are any questions, please feel free to contact me. <br />Sincerely, <br />James B. McArdle <br />Reclamation Specialist <br />JBM/co <br />Enclosure <br />