Laserfiche WebLink
<br />SBSLOPE DATA.WORKSHEET <br />I <br />Project: 009 pond as-bu'It 4~1 slope <br />Location: New Horizon Mine <br /> Point Data Lina Data Soii Da[a <br /> x y No Left Right Soil Phrealic No Density Cohesion Phi <br /> Point Paint No. Lines(Y/N) <br /> 1 100.0 100 1 1 10 2 N 1 107 84 29 <br /> 2 100 144.5 2 1 4 2 N 2. 120 163 26 <br /> 3 100 150 3 4 8 2 N <br /> 4 192.5 144.5 4 8 9 2 N <br /> 5 214.5 150 5 4 5 1 N <br /> 6 222.5 152 6 5 6 1 N <br /> 7 237.5 152 7 6 7 1 N <br /> 8 240 151 8 7 8 1 N <br /> 9 280 151 9 5 8 1 Y <br /> 10 280 100 <br /> FREE WATER LINE <br />• Left Point: 3 Right Point: 5 <br /> <br />• <br />Attactnnent 2.05.3(3)5- 19 <br />Attachment 2.05.3(3)4- 24 <br />