Laserfiche WebLink
<br />CONTENTS (continued) <br />EXHIBIT R PROOF OF FILING WITH COUNTY CLERK AND RECORDER.......... R-1 <br />EXHIBITS PERMANENT MAN-MADE STRUCTURES .............................................5-1 <br />S.1 Structures within 200 Feet of the Piceance Site ...............................................5-1 <br />S.2 Structures within 200 Feet of the Pipelines .....................................................5-2 <br />S.3 Structures within 200 Feet of the Parachute Site ...........................................5-5 <br />EXHIBIT T DESIGNATED MINING OPERATION <br />ENVIRONMENTAL PROTECTION PLAN ................................................T-1 <br />T.1 Definition of Designated Mining Operation ...................................................T-1 <br />T.2 Classification of Yankee Gulch Project .............................................................T-1 <br />"EXHIBIT U" (RULE 6.5) GEOTECHNICAL STABILITY EXHIBIT .......................... ..U-1 <br />U.1 Potential Geological Hazards .......................................................................... ..U-1 <br />U.2 Stability ............................................................................................................... ..U-1 <br /> U.2.1 Slope Stability ........................................................................................ ..U-1 <br /> U.2.2 Solution Mining Cavity Stability ...................................................... ..U-3 <br />U.3 Potential Off-site Geological Impacts ............................................................. ..U-4 <br />U.4 Blasting ................................................................................................................ ..U-4 <br />U.5 References ........................................................................................................... .. U-5 <br /> TABLES <br />Table D-1 Disturbed Area for Mining Panels <br />Table D-2 Well Development Schedule <br />Table D-3 Overburden Summary <br />Table E-1 Disturbed Area Requiring Reclamation for the Six Mining Panels <br />Table F-1 Mining and Reclamation Timetable <br />Table G-1 Groundwater Quality of the Upper Aquifer from Well 20-8 <br />Table G-2 Groundwater Quality of the Upper and Lower Aquifer from Well 20-3 <br />Table G-3 Groundwater Quality of Aquifers from Wells 20-1, 20-5, and 21-2 <br />Table H-1 Special Status Species <br />Table I-1 Soils in the Study Area <br />Table I-2 Soil Erosion Characteristics <br />Table I-3 Soil Salvage and Reclamation Characteristics <br />