My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100006
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:54:55 PM
Creation date
11/24/2007 6:41:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004001
IBM Index Class Name
Permit File
Doc Date
1/28/2004
Doc Name
Reponse to Reclamation Permit
From
SEO
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~,~W <br />~--- <br />TE OF COLORADO <br />OFFICE OF THE STATE ENGINEER SCI \PG'V <br />Division of Water Resources <br />Department of Natural Resources IA <br />a <br />.'Z~"'; <br /> ~~ <br />~ <br />~ <br />.1H 'b ,~ <br />]313 Sherman Street, Room 878 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 eta <br />~~~~~~ptPA-t~ n e ~r <br />FAX (303) 866-3589 <br />wevwwa[ecstate.co.us Response to Reclamation Permit Application Consideration <br />DATE: January 28, 2004 <br />TO: Harry H. Posey, Senior Environmental Protection Specialist <br />CC: Division Z Office; Distri t 67 Water Commissioner <br />FROM: Don West, P.E. <br />RE: Lofdahl Pit, File No. M-2004-001 <br />Operator: Lincoln County <br />Contact: Don Blake, 719/743-2337 <br />Section I, Twp 14 S, Rng 54 W, 6th P.M., Lincoln County <br />oe coco <br />NQ , r <br />~~~ ~~ ~, <br />° <br />~\k~ i, <br />\1876 ~ <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in [he mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />requesta hearing before the State Engineer. <br />® Other: Applicant must ensure that all ponded stormwater is released to the natural stream system <br />within 72 hours, or all work must cease until a substitute water supply plan, or augmentation plan <br />approved by water court, is obtained. Storm water may NOT be directed into a man made pond if <br />the water wil] be retained for more than 72 hours. Reclamation plans must ensure water will not be <br />retained onsite for more than 72 hours unless an augmentation plan approved by water court is <br />obtained. A pond may NOT be constructed for post-mining reclamation unless an augmentation <br />plan is approved by water court. <br />COMMENTS: <br />
The URL can be used to link to this page
Your browser does not support the video tag.