Laserfiche WebLink
~ y ~7 <br />,~~1~~~~ <br />It1,11 l,l <br />bcpth of topsoil on the rcclainted parcels <br />ranges I~rnn five to cigln inches, an <br />indication that suflicicnt topsoil replacement <br />has lien Achieved. Analysis of nutrient <br />AYA11Ab1111Y reveals n significant nitrogen <br />deficiency and A slight phosphorus <br />dcticicncy Across both rcdaimed parcels-. <br />The potassium conccntmtion And pcrccnCtgc <br />of organic molter is adcyuate for rcdamaiion <br />nctiy hies. <br />fable 1 displays the results of the topsoil analysis conducted at each soil pit location. <br />fable 1 <br />Results of'Ibpsoil :analysis <br />Lnnc Pinc Gulch Portal tiitc <br /> Sam Ic Vumber _ <br />_ __ _ TS•1 REC-I REG2 _ REG3 <br />Slope(g~Sample I°o J% 20°° 30"° <br />Lorntion <br />De th of Topsoil _ R inches 6 inches 5 inches 7 inch_~•s <br />Tcwune ~ _ <br />--- tiilt Loam Sunda Clay Loam <br />- Sand} Clay Loam Cla Loam__I <br />pll ~ 6.1 <br />- 7.5 6.? 7.3 f <br />- <br />\itmtc __ _ _20.8 ppm _.8ppm 2.? ppm 12.2Spm I <br />Phosphorus 10.6p~ I?.5p m 2v.~nn 16.8 ~~ <br />Potassium _;_ ? 13,9 m 20~_2~, m 366_.' ppm 216.3 ppm <br />D IC matter I 3.1 %~0 ~ ~~.~ 't.'I°'0 3.49b <br />