Laserfiche WebLink
Attachment A <br />Stipulation No. l: ~ <br />THE PERMITTEE MUST DEVELOP AND SUBMIT A SURFACE WATER BUDGET THAT <br />ADDRESSES THE AMOUNT OF IJATER REP40'JED FROM THE MIDDLE FORK OF THE <br />PURGATOIRE RIVER OR WELLS, THE AMOUNT OF WATER THAT IS CONSUMPTIVELY <br />USED DURING MINING AND RELATED ACTIVITIES, AND THE AMOUNT OF :DATER THAT <br />IS DISCHARGED TO THE RIVER. THIS INFURtM TION MUST BE SUBMITTED WITHIN <br />30 DAYS OF PERt4IT ISSUANCE. <br />Stipulation No. 2: / <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE PERMITTEE SHALL ERECT STREAM <br />BUFFER ZONE SIGNS ON ALL UNDISTURBED AREAS BORDERING THE MIDDLE FORK OF <br />THE PURGATOIRE RIVER WITHIN AND DIRECTLY ADJACENT TO THE PERt+IITTEU <br />DISTURBED AREA. THESE SIGNS r4UST BF ERECTED AT THE EDGE OF THE <br />DISTURBED/UNDISTURBED AREA OR 100 FEET FROM THE EDGE OF THE STREAM, <br />WHICHEVER IS LESS. <br />Stipulation No. 3: <br />WITHIN 30 DAYS OF PERMIT ISSUANCE, THE PERtITTEE MUST SUBMIT A STATEr1ErJT <br />CERTIFIED BY A REGISTERED PROFESSIOPJAL ENGINEER THAT fHE FOUR SEDIrENT <br />PONDS HAVE BEEN CONSTRUCTED AS DESIGNED. <br />Stipulation No. 4: '~ <br />WI~fHIN 60 DAYS OF PERr4IT ISSUANCE, TI1E PERMITTEE MUST SUBMIT N PLAN FOR <br />SEDIMENT CONTROL FOR THE WEST AREA. IF THIS PLArJ DOES NOT INCLUDE THE <br />USE OF SEDIMENT PONDS, A REQUEST MUST BE MADE FOR ALTERWATIVE SEUIr9EiVT <br />CONTROL MEASURES. THE REQUEST MUST JUSTIFY WHY SEDIMENT PONDS ARE NOT <br />NEEDED TO MEET EFFLUENT LIi4ITATION FOR THESE AREAS IN ACCORDANCE WITH <br />RULE 4.05.2(3). IN ADDITION, THE PERMITTEE MUST DESCRIBE WHAT <br />ACTIVITIES OVER THE NEXT FIVE YEARS WILL OCCUP. IN THE WEST AREA, AND THE <br />LOCATION AND DESIGNS OF DITCHES AND CULVERTS USED 70 ROUTE RUNOFF WATER <br />TO THE RIVER. THIS PLAN WILL BE SUBMITTED AS A REVISION TU THE PERMIT. <br />Stipulation No. 5: / <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE PERMITTEE SHALL ItJSTALL STAFF <br />GAGES IN SEDIMENT PONDS 006 and 007 THAT INDICATE THE LEUEL OF SEDIMENT <br />STORAGE VOLUME AS A PERCENTAGE ilF THE TOTAL SEDIMENT STORAGE VOLUidE. <br />Stipulation No. 6: <br />WITHIN 60 DAYS OF PERf•IiT ISSUANCE, THE PERMITTEE r4UST REVISE THE PERhIIT <br />APPLICATION TO INCLUDE ALL PERTINENT INFORMATION ON DISCHARGE FROM THE <br />SEDIMENT CONTROL PONDS. <br />