Laserfiche WebLink
<br />-9- <br />EITHER A PLAN TO BRING THE APACHE CANYON STREAM FORDS INTU <br />COt~1PLIANCE, OR A REQUEST FUR A VARIANCE FROM INSTALLIi~G CULVERTS IN <br />ACCORDANCE WITH RULE 4.03.3(2)(c). <br />A NARRATIVE ADDRESSING THE ACCESS ROAD CULVERT SPACING REQUIREMENTS <br />OF RULE 4.03.2(4)(e)(v). IF THE PRESENT CULUERT SPACING IS NOT IN <br />COMPLIANCE WITH RULE 4.03.2)4)(e)(v), THE PERMITTEE MUST EITHER <br />SUBMIT A PLAN TO BRING THE ROADS INTO COMPLIANCE OR REQUEST A <br />VARIANCE FROM THE CULVERT SPACING REQUIREMENTS IN ACCORDANCE WITH <br />RULE 4.03.2(1)(e). <br />THIS INFORMATION WILL BE SUBMITTED AS A REVISION TO THE PERf4IT. <br />Stipulation No. 29: <br />THE PERMITTEE MUST SUBMIT, AS A REVISION, A RECLAMATION PLAN FOR ROADS <br />AT THE ALLEN MINE THAT MEETS THE REQUIREMENTS OF RULES 4.03.2(7) AND <br />4.03.3(7) WITHIN 12 MONTHS OF PERMIT ISSUANCE. <br />Stipulation rJO. 30: J <br />THE PERMITTEE r4UST COMPLETE PILLAR STABILITY CALCULATIONS FOP, THE 50% <br />PROJECTED EXTRACTION LIMIT CONFIGURATIOfl CONTAINED WITHIN THE' <br />APPLICATION. THESE ANALYTICAL CALCULATIONS, PREPARED IN ACCORDANCE WITH <br />AN ANALYTICAL METHOD ACCEPTABLE TO THE DIVISION, SHALL BE SUBMITTED TO <br />THE DIVISION FUR REUIEIJ WITHIN 60 DAYS FOLLOWING PERMIT ISSUANCE. <br />Stipulation No. 31: ~ <br />THE PERMITTEE SHALL SUBMIT A COMPLETE COPY 0 <br />EXHIBIT AN APPROPRIATE ORIGINAL SIGNATURE AN <br />RECERTIFICATION OF UNE SET OF MAPS CURRENTLY <br />OFFICE ~AITHIN 30 DAYS OF PERMIT APPROUAL. <br />F MAPS AND PLANS WHICH. <br />D SEAL OR CONDUCT <br />ON FILE AT THE DIVISION <br />