Laserfiche WebLink
-6- <br />i <br />Stipulation No. 19: "' <br />WITHIN 12 tAONTHS OF PERMIT ISSUANCE THE PERMITTEE MUST PROVIDE A PLAfJ TO <br />THE DIVISION FOR THE RECLAfgATIOfJ OF ALL DISTURBED SURFACE LANDS WHICFI <br />WILL NOT BE RETUPSOILED DUPING RECLN~IATIOtJ. THIS PLAfJ MUST INCLUDE <br />ANALYSES OF AN APPROPRIATE NUh16ER OF SAMPLES OF THE DISTURBED MATERIAL <br />TO DEMONSTRATE SUITABILITY OF THE MATERIAL TO A DEPTH OF 40 INCHES OfV <br />THE BASIS OF TEXTURE, pH, ELECTRICAL CONDUCTIVITY, SAP., SATURATION <br />PERCENTAGE, PERCENT ORGANIC h1ATTER, SELENIUf•I, AND BOROfJ. THE PLAN MUST <br />ALSO INCLUDE APPROPRIATE hIEASURES WHICH WILL BE EMPLOYED DURING <br />PREPARATIOtJ OF THE DISTURBED SURFACE PRIOR TO SEEDING (i.e., REDUCTION <br />OF COMPACTION). <br />IF THE ANALYSES OF THE IN-PLACE MATERIAL INDICATE THAT SUCCESSFUL <br />REVEGETATION CANNOT BE ATTAINED, THE PERP•1ITTEE MUST EITHER APPLY <br />APPROPRIATE AMENDMENTS TO MAKE IT SUITABLE OR IMPORT SUITABLE MATERIAL. <br />IF AMENDMENTS OTHER THAN NITROGEN, PHOSPHORUS, POTASSIUM, SULFUR, OR <br />IRON ARE REQUIRED, THE PERf+IITTEE MUST SUBMIT THE RESULTS OF APPROPRIATE <br />TESTS TO PROVE THE AMEfJDMENT MATERIAL IS SUITABLE FOR REVEGETATION. <br />THIS PLAN WILL BE SUBMITTED AS A REVISION) TO THE PERMIT. <br />Stipulation No. 20: ~ <br />THE PERMITTEE SHALL SUBMIT TO THE DIVISION A TABLE OF THE ACTUAL AND <br />PROPOSED ACREAGES OF DISTURBANCE FOR EACH VEGETATION TYPE AT THE ALLEN <br />MINE WITHIN 30 DAYS OF PERMIT ISSUANCE. FOR THOSE VEGETATION <br />COMMUNITIES (PONDEROSA PINE -OAK, PONDEROSA PINE - OAK - DOUGLAS FIR, <br />UR WILLOW CARR, WHICH COh1PRI5E 5 PERCENT OR LESS OF THE LIFE-OF-hIINE <br />AFFECTED ACREAGE, NO ADDITIONAL BASELINE SAMPLING WILL BE REQUIRED. <br />Stipulation No.21: / <br />WITHIN 6 MONTHS OF PERf1IT ISSUANCE, THE PERMITTEE SHALL SUBMIT TO <br />THE DIVISION FOR AP PROUAL A REVISION CONTAINING A PLAN FOR THE <br />SAMPLING OF COUER, PRODUCTIOtJ, SPECIES C01~1POSITIOfJ AND WOODY PLANT <br />DENSITY IN 60TH THE AFFECTED AND REFERENCE AREAS OF THE PONDEROSA <br />PINE-OAK, PONDEROSA PINE-OAK-DOUGLAS FIR, AND WILLOW CARR <br />VEGETATION COh1i4UNITIES, IF THESE COMMUNITIES ARE DETERMINED TO BE <br />MAJOR COMMUNITIES UNDER INFORMATION PROVIDED IN COfJJUNCTIOtJ WITH <br />STIPULATION N0. 20. <br />AFTER DIVISION APPROVAL THE PERMITTEE SHALL CONDUCT THE APPROVED <br />SAMPLING DURING THE NEXT GROWING SEASON. RESULTS SHALL BE <br />SUBMITTED TO THE DIVISION IJITHIN THIRTY DAYS OF COi~1PLETION OF <br />SAMPLING. <br />B. THE PERMITTEE WILL DEMONSTRATE THE EQUIVALENCE OF THE REFERENCE <br />AREAS TO THE RESPECTIVE AFFECTED AREAS PRIOR TO RELEASE FROM THE <br />OBLIGATIONS OF THIS STIPULATION. <br />