Laserfiche WebLink
%%//////%/////// <br />STATE OF COLORAV ~~~ <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Rewurces <br />1313 Sherman 51 ,Room 27 5 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FA%: 1303) 832-8106 <br />March 30, 1994 <br />Mr. Allen Weaver <br />Mine Engineer <br />Energy Fuels Mining Company <br />P.O. Box 449 <br />Florence, CO 81226 <br />Re: February 24, 1994 Meeting at Raton Creek Mines <br />Energy Fuels Mining Company, Raton Creek Mines, Permit No. C-82-055 <br />Dear Mr. Weaver: <br />I~~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />Ken Salazar <br />Executive Duedor <br />Muhae B Lnng <br />Divisio" Dvenor <br />The purpose of this letter is to record the issues discussed during our meeting at the Raton <br />Creek Mine on February 24, 1994. Individuals present at that meeting included: <br />Mr. A.J. luppa, landowner; <br />Mr. Joe De Angelis, EFMC; <br />Mr. Clint Carey, EFMC; <br />Mr. Allen Weaver, EFMC; <br />Mr. Tony Waldron, DMG; and <br />Mr. Wallace Erickson, DMG <br />Issues discussed during the meeting include: <br />Phase I bond release requirements for the east side of the yard area where backfilling <br />operations of the Mine 1 portals had been completed; <br />2. Phase II bond release requirements specifically dealing with topsoil replacement; <br />3. Mining related structures not previously approved as permanent structures but <br />requested by the landowner to remain as permanent structures; and <br />4. Watershed Diversion Ditch 1 maintenance and design. <br />A brief description of the four basic issues follows. <br />1. Phase I bond release requirements for the east side of the yard area. <br />Rule 3.03.112)(a) states, "Up to sixty percent of the applicable bond amount shall be <br />released when the permittee successfully completes backfilling, regrading, and <br />drainage control in accordance with the approved reclamation plan." <br />