My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-12-16_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
1992-12-16_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2021 7:37:52 PM
Creation date
11/23/2007 11:30:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
12/16/1992
Doc Name
Proposed Decision & Findings of Compliance for RN2
Permit Index Doc Type
Findings
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. DRY HOLES OR HOLES SEALED IN INTERVALS SHALL BE PERMANENTLY PLUGGED <br /> WITH AN EXPANDING PLUG PLACED TEN FEET BELOW GROUND LEVEL FOLLOWED <br /> BY SEVEN FEET OF CEMENT. <br /> F. THE TOP THREE FEET OF CASING SHALL BE REMOVED AND THE AREA FILLED <br /> WITH SOIL DURING FINAL ABANDONMENT. <br /> G. WELL COMPLETION DATA AND AQUIFER TEST RESULTS SHALL BE INCLUDED IN <br /> QUARTERLY HYDROLOGIC REPORTS SUBMITTED TO THE DIVISION. <br /> STATUS: Terminated <br /> Stipulation No. 37 <br /> MOUNTAIN COAL COMPANY WILL SUBMIT REVISED PAGE 3-35 AND EXHIBIT 3.2.7. 1A <br /> AND BOND CALCULATIONS FOR RECLAMATION BY AUGUST 6, 1989. <br /> STATUS: Complied With <br /> Stipulation No. 38 <br /> MOUNTAIN COAL COMPANY WILL INCORPORATE DETAILS OR A REFERENCE TO THE WEED <br /> CONTROL PLAN INTO THE PERMIT APPLICATION BY SEPTEMBER 14, 1990. <br /> STATUS: Terminated <br /> Stipulation No. 39 <br /> PRIOR TO THE CONSTRUCTION OF THE COAL STORAGE PAD, A PLAN MAP MUST BE <br /> SUBMITTED SHOWING THE PROPOSED TOPOGRAPHY OF THE PAD. THIS MAP MUST SHOW <br /> THE LOCATION OF THE CLEAN WATER DITCHES, SEDIMENT DITCHES, AND SEDIMENT <br /> TRAP AND CULVERTS. <br /> STATUS: Complied With <br /> Stipulation No. 40 <br /> PRIOR TO DISTURBING THE AREA OF THE STORAGE PAD, MOUNTAIN COAL COMPANY <br /> MUST SUBMIT CALCULATIONS TO SHOW THAT THE SEDIMENT POND RECEIVING THE <br /> RUN-OFF FROM THE STORAGE PAD IS SUFFICIENTLY SIZED TO HANDLE THE <br /> CALCULATED VOLUME OF WATER. <br /> STATUS: Complied With <br /> Stipulation No. 41 <br /> PRIOR TO THE IMPORTATION OF FILL MATERIAL TO CONSTRUCT THE COAL STACKING <br /> TUBE PAD, MOUNTAIN COAL MUST SUBMIT BOND CALCULATIONS AND UPDATE THE <br /> RECLAMATION PLAN FOR THE REMOVAL OF THE FILL MATERIAL. THE SOURCE OF THE <br /> FILL MATERIAL MUST BE IDENTIFIED. IF GOB IS TO BE USED, THIS MUST BE <br /> PROPOSED AS A TECHNICAL REVISION AND BE SUPPORTED WITH DESIGNS THAT MEET <br /> THE DIVISION'S PERFORMANCE STANDARDS FOR COAL WASTE BANKS. PLANS MUST BE <br /> CERTIFIED BY A QUALIFIED ENGINEER. <br /> -12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.