My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-12-16_GENERAL DOCUMENTS - C1980007
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
1992-12-16_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2021 7:37:52 PM
Creation date
11/23/2007 11:30:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
12/16/1992
Doc Name
Proposed Decision & Findings of Compliance for RN2
Permit Index Doc Type
Findings
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 29 <br /> WITHIN NINETY (90) DAYS OF APPROVAL OF THE LOWER WASTE PILE PERMIT <br /> REVISION, WECC SHALL SUBMIT A REVISED WATER MONITORING PLAN THAT INCLUDES <br /> MONITORING OF THE WASTE PILE. THE PLAN SHALL INCLUDE DIRECT SAMPLING OF <br /> THE SEDIMENT POND AND UNDERDRAINS DISCHARGE TWICE PER YEAR DURING THE <br /> SECOND AND THIRD QUARTER OF THE YEAR. THE PARAMETERS SHALL BE THE FULL <br /> LIST OF CHEMICAL CONSTITUENTS, AS LEAST FOR THE FIRST YEAR. MCC MAY <br /> REQUEST AN ADJUSTMENT OF THE MONITORING REQUIREMENTS AFTER THE FIRST <br /> YEAR, DEPENDING ON THE RESULTS OF THE MONITORING. <br /> STATUS: Complied With <br /> Stipulation No. 30 <br /> MCC MUST SUBMIT ADDITIONAL BOND, IN THE AMOUNTS DESCRIBED IN THE LOWER <br /> WASTE PILE PERMIT REVISION APPLICATION, AT LEAST THIRTY (30) DAYS PRIOR <br /> TO THE COMMENCEMENT OF CONSTRUCTION OF PHASES III , IV, AND V OF THE LOWER <br /> WASTE PILE. THESE ADDITIONAL BONDS MUST BE APPROVED AND ACCEPTED BY THE <br /> DIVISION PRIOR TO CONSTRUCTION FOR THESE PHASES. <br /> STATUS: Terminated <br /> Stipulation No. 31 <br /> MCC SHALL FORWARD FIVE (5) COPIES OF THE COLORADO DEPARTMENT OF HIGHWAYS' <br /> WRITTEN APPROVAL FOR ACTIVITIES WITHIN 100 FEET OF THE OUTSIDE <br /> RIGHT-OF-WAY OF COLORADO HIGHWAY 133 WITHIN THIRTY (30) DAYS OF APPROVAL <br /> OF THE PERMIT REVISION APPLICATION. <br /> STATUS: Complied With <br /> Stipulation No. 32 <br /> THE APPLICANT SHALL MONITOR THE TWO MONITORING WELLS LOCATED OVER THE <br /> FIRST PANEL TO BE SUBSIDED ONE YEAR PRIOR TO MINING THIS PANEL. THE <br /> APPLICANT SHALL SUBMIT TO THE REGULATORY AUTHORITY GROUND WATER LEVEL <br /> DATA AND WATER QUALITY DATA PRIOR TO MINING THIS PANEL. <br /> STATUS: Future <br /> Stipulation No. 33 <br /> SHOULD THE APPLICANT ENCOUNTER MORE GROUND WATER THAN ANTICIPATED, PRIOR <br /> TO THE DISCHARGE OF EXCESS MINE WATER, THE APPLICANT SHALL PROVIDE AN <br /> ANALYSIS OF ANTICIPATED WATER QUALITY AND QUANTITY, AND AN ASSESSMENT OF <br /> THE EFFECTS ON THE RECEIVING STREAM. <br /> STATUS: Terminated <br /> Stipulation No. 34 <br /> MOUNTAIN COAL COMPANY SHALL COLLECT AT LEAST ONE COMPOSITE, <br /> REPRESENTATIVE SAMPLE OF THE DISCHARGE WATER FROM THE OLD PORTAL AND HAVE <br /> IT PROPERLY ANALYZED FOR THE FOLLOWING PARAMETERS: <br /> -10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.