Laserfiche WebLink
List of Stipulations <br />A REVISED EXHIBIT 27, DESCRIBING TH[ h1ANAGEIgEtJT PLANS TU BE <br />It4PLEMENTED FUR A DRYLAhJU PASTURE h1UST BE SUBI.IITTEU FUR DIVISION <br />AP PRUVAL WITHIN 9U DAYS OF PERI.IIT ISSUANCE. <br />THE GROUND WATER MONITORING PROGkAt•1 WILL ItJCLUDE THE FULLOWIIVG <br />MUIVITORING FREQUEtJCY AfJD ALL WATER ANALYSES WILL BE PERFORMED USING <br />THE PARAMETERS LISTEU BELOW: <br />WELL 41ATER LEVEL WATER SAI4PLLIVG <br />DESIGNATION CHECK FREQUENCY FREQUEtJCY <br /> WT I.101•IIHLY QUARTERLY <br /> 4J5 MONTHLY QUARTERLY <br /> W6 f•10NTHLY QUARTERLY <br /> W6c t•IONTIiLY QUARTERLY <br /> W9 MUNTHLY QUARTERLY <br /> WlU FIUfITHLY QUARTERLY <br /> kEQUIREU PARAMETERS <br /> <br />PH (FIELU) CALCIUI4 SULFATE LEAD <br />CUNDUC7IUITY AT 25°c (FIELD) t•1AGNESIUM ALUI4INU1•I MANGAhJESE <br />TEMPERATURE (FIELD) AI~IMUNIA AR SEN[C MERCURY <br />TOTAL DISSOL VED SOLIDS NITRATE CADMIUM SELENIUM <br />BICARBONATE SODIUM IRON ZINC <br />THE APPLICANT SHALL INSTALL A MUtV1TURING WELL IN THE SOUTHWESTERN <br />PORTION OF THE UNC'KFILLED PI I. THE WELL SHALL BE ItJSTALLED ItJ THE <br />LOWEST PORTION OF THE PIT IN UItUER TU I.1UIV11(1R THE SPOIL AQUIFER. <br />MONITORING PNRAh1ETERS SHALL INCLUDE; MUNTHLY WATER LEVELS, AS WELL <br />AS THE FOLLOWING FIELD PARAI.IETERS: pH,ELECTRO-CONDUCTIVITY, <br />TEMPERATURE, ANU QUARTERLY WATER CHEM[STKY. <br />4. THE APPLICANT SHALL CONDUCT A hI1tJIMUhI OF THREE INFILTRATIOfJ TESTS <br />OVER THE EXISTING RLCLAIMEU SPOILS. RESULTS OF THESE TESTS PLUS AN <br />ESTIh1ATEU RECHARGE RATE FUR THE kECLAIMED SPOILS SHALL BE SUBh1ITTEU <br />TO THE DIVISION WITHIN 6 MUIVTHS OF THE PERt•1IT ISSUANCE. <br />THE APPLICANT SHALL CO NUUCT A I•ilNll•1Ut4 OF THREE 6U-DAY STAGIVNIJT <br />LEACH TESTS OF THE SPOILS PLACED iW THE SA7URA[EU ZONE OF THE <br />BACKFILLED PIT. THE WATER SAtgPLES OBTAItVEU FROM THE LEACH TEST <br />SHALL BE ANALYZED FUR THE PARAI.IETERS LISTEU IIV STIPULATION 2. THE <br />DATA FRUt4 LEACH TESTS ANU A PROJECTION OF THE SPOIL WATEk QUALITY <br />SHALL BE SUBMIiiED TD THE DIVISION WITHIIV 3 t•10NTHS OF PERMIT <br />ISSUANCE. <br />6. THE SURFACE WATER h10NITURIIVG PRUGI2AM 4JILL ItJCLUUE THE FULL04JING <br />h10NITOR1tVG FREQUENCY ANU ALL WATER ANALYSES tV1LL BE PERFURI.1ED USING <br />THE PARAMETERS LISTEU BELObJ: <br />MONITORING SITE <br />DESIGNATION <br />FLOIV h1EASUREI4ENT <br />FREQUENCY <br />WATER SAI.IPLING <br />FREQUEtJCY <br />Sl <br />S2 <br />S3 <br />14UtJTHLY <br />MUTJTHLY <br />h10tJ111LY <br />IREU PARAI4EfLRS <br />pH (FIELD , <br />CONDUCTIVITY AT 25°c (FIELU) <br />TUT AL DISSOLVED SOLIDS <br />TOTAL SUSPENDED SOLIDS <br />OIL AND GREASE <br />SODIUM ABSORPTION RATIO <br />BICARBONATE <br />CALCIUM <br />MAGNES I Ut4 <br />NITRATE <br />S 1)I 1 I lll•1 <br />QUARTERLY <br />QUARTLRLY <br />QUARTERLY <br />SULFATE <br />A L UI.7I tJ Ui4 <br />NRSEIVIC <br />CADMIUM <br />IRON <br />LE AU <br />MAIVGNNESE <br />MERCURY <br />I4ULYBUENUM <br />SELENIUM <br />,' I Nr, <br />